Resource Pool Location for Periodic Services in Decentralized Multi-Project Scheduling Problems

被引:15
作者
Rostami, Mohammad [1 ]
Bagherpour, Morteza [1 ]
Mazdeh, Mohammad Mahdavi [1 ]
Makui, Ahmad [1 ]
机构
[1] Iran Univ Sci & Technol, Dept Ind Engn, Tehran 1193653471, Iran
关键词
Multi-project scheduling; Resource pool location; Periodic services; Heuristic method; Combinatorial artificial bee colony; ARTIFICIAL BEE COLONY; PARTICLE SWARM OPTIMIZATION; GENETIC ALGORITHM; MODEL;
D O I
10.1061/(ASCE)CP.1943-5487.0000671
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Going through the literature of multi-project scheduling problems reveals that the resources required for the completion of each activity need to move among other activities without spending time and money. Recently, the literature has been mainly concentrated on resource transfer among the activities for decentralized multi-project scheduling problems. Determining the best location of facilities for periodic services is one of the main points in the decentralized multi-projects scheduling problem. Indeed, discovering the best known location can reduce the project completion time, in particular for those projects in which the activities are far from each other and also activity's execution takes significant time. This article introduces a novel decentralized resource-constrained multi-project scheduling problem considering periodic services. The purpose of this problem is to minimize the cost associated with the project's completion times (at the operational level) and the construction cost of resource pool (at the strategic level) at the same time. First, for better illustration of the problem under consideration, a mixed-integer linear programming model is presented, which efficiently solves small-size problems in a reasonable time. Then, a fast priority rule-based constructive heuristic algorithm is originally introduced. Finally, by incorporating the proposed heuristic structure, a combinatorial artificial bee colony (CABC) algorithm is developed to solve such large-size problems efficiently. To evaluate the modeling procedures, the computational results and managerial insights on test problems are presented. The results reveal that in decentralized multi-project scheduling problems, by considering the resource pool's location the total costs will be reduced. Numerical investigations indicate that the proposed CABC algorithm yields the best known solutions with an average relative gap of 2.5% for large-size instances. (C) 2017 American Society of Civil Engineers.
引用
收藏
页数:16
相关论文
共 49 条
  • [1] A multi-agent system for decentralized multi-project scheduling with resource transfers
    Adhau, Sunil
    Mittal, M. L.
    Mittal, Abhinav
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 146 (02) : 646 - 661
  • [2] A Neurogenetic approach for the resource-constrained project scheduling problem
    Agarwal, Anurag
    Colak, Selcuk
    Erenguc, Selcuk
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 44 - 50
  • [3] Akbari R., 2011, International Journal of Industrial Engineering Computations, V2, P45
  • [4] Resource-constrained multi-project scheduling: Priority rule performance revisited
    Browning, Tyson R.
    Yassine, Ali A.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2010, 126 (02) : 212 - 228
  • [5] Multi-project scheduling with two-stage decomposition
    Can, Anil
    Ulusoy, Gunduz
    [J]. ANNALS OF OPERATIONS RESEARCH, 2014, 217 (01) : 95 - 116
  • [6] Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem
    Chen, Ruey-Maw
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (06) : 7102 - 7111
  • [7] Ant Colony Optimization for Software Project Scheduling and Staffing with an Event-Based Scheduler
    Chen, Wei-Neng
    Zhang, Jun
    [J]. IEEE TRANSACTIONS ON SOFTWARE ENGINEERING, 2013, 39 (01) : 1 - 17
  • [8] Optimizing Discounted Cash Flows in Project Scheduling-An Ant Colony Optimization Approach
    Chen, Wei-Neng
    Zhang, Jun
    Chung, Henry Shu-Hung
    Huang, Rui-Zhang
    Liu, Ou
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS, 2010, 40 (01): : 64 - 77
  • [9] Using a fuzzy clustering chaotic-based differential evolution with serial method to solve resource-constrained project scheduling problems
    Cheng, Min-Yuan
    Duc-Hoc Tran
    Wu, Yu-Wei
    [J]. AUTOMATION IN CONSTRUCTION, 2014, 37 : 88 - 97
  • [10] The impact of fixed and variable costs in a multi-skill project scheduling problem: An empirical study
    Correia, Isabel
    Saldanha-da-Gama, Francisco
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 72 : 230 - 238