Comparison of construction photograph and VR image in construction progress

被引:37
作者
Kim, Hyungeun
Kano, Naruo
机构
[1] Waseda Univ, Adv Res Inst Sci & Engn, Shinjuku Ku, Tokyo 1698555, Japan
[2] Waseda Univ, Dept Architectural, Shinjuku Ku, Tokyo 1698555, Japan
关键词
virtual reality; progress control; construction photograph; image comparison;
D O I
10.1016/j.autcon.2006.12.005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A photograph always makes an image of objects as they are without any alteration, so that a photograph is recognized as highly accurate information. Thus the photograph has been widely used as a record of site, routine work particularly for construction control and inspection. As a characteristic of photograph, the point of view for a photo image is identical to that of a VR image which can be created based on 3D CAD. In other words, matching of the photo image and the VR image provides a convenient way to examine the difference between the actual situation in a job site and the design drawing for the building. This paper suggests the method for the determination of the 3-dimensional viewpoint and the direction vector of a construction photograph to perform comparison of the construction photograph and the corresponding VR image. In addition, through a case study in which acquisition of construction photographs and comparison of construction photographs and VR images according to the elapsed time have been carried out, the validity of proposed methods has been well proved. (c) 2007 Elsevier B.V. All rights reserved.
引用
收藏
页码:137 / 143
页数:7
相关论文
共 11 条
  • [1] Akinci B, 1998, COMPUTING IN CIVIL ENGINEERING, P342
  • [2] [Anonymous], AUTOMATION CONSTRUCT
  • [3] HYUNGEUN K, 2004, COMPUTER TECHNOLOGY, P31
  • [4] VIRCON: Interactive system for teaching construction management
    Jaafari, A
    Manivong, KK
    Chaaya, M
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (01): : 66 - 75
  • [5] Visualizing simulated construction operations in 3D
    Kamat, VR
    Martinez, JC
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2001, 15 (04) : 329 - 337
  • [6] KANO N, 2001, P S KENCH SEIS ARCH, P57
  • [7] Feasibility study of 4D CAD in commercial construction
    Koo, B
    Fischer, M
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (04): : 251 - 260
  • [8] NARUO K, 2003, VIRTUAL CONSTRUCITON, V19, P95
  • [9] Retik A., 1999, Automation in Construction, V8, P671, DOI 10.1016/S0926-5805(98)00113-7
  • [10] RETIK A, 1997, INT J PROJECT MANAGE, V3, P28