Scheduling of the optimal tool replacement times in a flexible manufacturing system

被引:31
|
作者
Liu, PH [1 ]
Makis, V [1 ]
Jardine, AKS [1 ]
机构
[1] Univ Toronto, Dept Mech & Ind Engn, Toronto, ON M5S 1A4, Canada
关键词
D O I
10.1080/07408170108936848
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In Flexible Manufacturing Systems (FMSs), a cutting tool is frequently used for different operations and on different part types to minimize tool change-overs and the number of tools required, and to increase part-routing flexibility. In such situations, the tools become shared resources and work in job-dependent, changeable and nonhomogeneous conditions. It is well known that the tool failure rate depends on both age and machining conditions and that tool reliability is a function of the duration, machining conditions, and the sequence of the operations in FMS. The objective of this paper is to obtain a schedule of the optimal preventive replacement times for the cutting tools over a finite time horizon in a flexible manufacturing system. We assume that the tool will be replaced either upon failure during an operation or preventively after the completion of each operation, incurring different replacement costs. A standard stochastic dynamic programming approach is taken to obtain the optimal tool replacement times. The optimal schedule is obtained by minimizing the total expected cost over a finite time horizon for a given sequence of operations. A computational algorithm is developed and a numerical example is given to demonstrate the procedure.
引用
收藏
页码:487 / 495
页数:9
相关论文
共 50 条
  • [41] A multilevel machine and vehicle scheduling in a flexible manufacturing system
    Sawik, T
    MATHEMATICAL AND COMPUTER MODELLING, 1996, 23 (07) : 45 - 57
  • [42] A DISTRIBUTED APPROACH TO JOB SCHEDULING IN A FLEXIBLE MANUFACTURING SYSTEM
    AHLUWALIA, RS
    JI, P
    COMPUTERS & INDUSTRIAL ENGINEERING, 1991, 20 (01) : 95 - 103
  • [43] A multiobjective genetic algorithm for scheduling a flexible manufacturing system
    Sankar, SS
    Ponnanbalam, SG
    Rajendran, C
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2003, 22 (3-4): : 229 - 236
  • [44] HEURISTIC SOLUTION TO THE SCHEDULING PROBLEMS IN FLEXIBLE MANUFACTURING SYSTEM
    MUKHOPADHYAY, SK
    MAITI, B
    GARG, S
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (10) : 2003 - 2024
  • [45] A multiobjective genetic algorithm for scheduling a flexible manufacturing system
    S. Saravana Sankar
    S. G. Ponnanbalam
    C. Rajendran
    The International Journal of Advanced Manufacturing Technology, 2003, 22 : 229 - 236
  • [46] An Algorithm for Optimal Cyclic Scheduling in a Robotic Cell with Flexible Processing Times
    Yan, Pengyu
    Chu, Chengbin
    Che, Ada
    Yang, Naiding
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 153 - +
  • [47] Scheduling tool for flexible manufacturing systems using hybrid genetic algorithm
    Noor, Sahar
    Khan, M. K.
    Hussain, Iftikhar
    Ullah, Irfan
    SECOND INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES 2006, PROCEEDINGS, 2006, : 554 - +
  • [48] Tool handling and scheduling in a two-machine flexible manufacturing cell
    Agnetis, A
    Dror, M
    Vakharia, AJ
    Rossi, F
    IIE TRANSACTIONS, 1996, 28 (05) : 425 - 437
  • [49] Tool handling and scheduling in a two-machine flexible manufacturing cell
    Universita di Roma 'La Sapienza', Roma, Italy
    IIE Trans, 5 (425-437):
  • [50] Scheduling tasks on a flexible manufacturing machine to minimize tool change delays
    Ecker, KH
    Gupta, JND
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 164 (03) : 627 - 638