Ex post appraisal: What lessons can be learnt from EU cohesion funded transport projects?

被引:39
作者
Kelly, Charlotte [1 ]
Laird, James [1 ]
Costantini, Stefano [2 ]
Richards, Phil [3 ]
Carbajo, Jose [2 ]
Nellthorp, John [1 ]
机构
[1] Univ Leeds, Inst Transport Studies, Leeds LS2 9JT, W Yorkshire, England
[2] Frontier Econ, London WC1V 6DA, England
[3] Atkins, Birmingham B1 1TF, W Midlands, England
关键词
Ex post evaluation; Cost benefit analysis; Optimism bias; Ex ante evaluation;
D O I
10.1016/j.tranpol.2014.09.011
中图分类号
F [经济];
学科分类号
02 ;
摘要
This paper is concerned with project level outcomes of 10 large transport projects spread over eight countries that had benefited from EU Cohesion and ISPA funding. These are analysed within a cost benefit analysis framework with comparisons being made between the ex ante and ex post cost benefit analyses. The research finds that despite much attention being placed on the issue of optimism bias over the last decade it still remains prevalent. It also finds that there is a clear need to improve the quality and consistency of ex ante analysis particularly in the areas of capital cost estimation, travel demand modelling and risk analysis. Additionally our research identifies the limited role that formal decision making tools such as cost benefit analysis and multi-criteria analysis play in the decision making process of the countries surveyed. The benefit of undertaking ex post cost benefit analysis is maximised when a set of schemes are analysed - thereby allowing patterns in outcomes and weaknesses in ex ante methodologies to be identified. Ex post work is not without its challenges particularly in defining the counterfactual and addressing institutional memory loss. (C) 2014 Elsevier Ltd All rights reserved.
引用
收藏
页码:83 / 91
页数:9
相关论文
共 29 条
[1]  
[Anonymous], PVC IS SUM DISC COST
[2]  
[Anonymous], NPV IS SUM DISC BEN
[3]  
[Anonymous], IPR REPR DISC RAT WH
[4]  
[Anonymous], PVB IS SUM DISC BE A
[5]  
[Anonymous], BCR IS CAL PVB PVC I
[6]  
Atkins, 2009, POST PROJ EV MET AN
[7]   LEARNING FROM EX-ANTE EX-POST COST-BENEFIT COMPARISONS - THE COQUIHALLA HIGHWAY EXAMPLE [J].
BOARDMAN, AE ;
MALLERY, WL ;
VINING, AR .
SOCIO-ECONOMIC PLANNING SCIENCES, 1994, 28 (02) :69-84
[8]  
Boiteux M., 2001, TRANSP CHOIC INV COU
[9]  
Chevroulet T., 2008, DEL 4 1 REP FIND OUT
[10]  
Department for Transport, 2014, WEBTAG TAG UNIT A1