Integrated Sequential As-Built and As-Planned Representation with D4AR Tools in Support of Decision-Making Tasks in the AEC/FM Industry

被引:135
作者
Golparvar-Fard, Mani [1 ]
Pena-Mora, Feniosky [2 ]
Savarese, Silvio [3 ]
机构
[1] Virginia Tech, Charles E Via Dept Civil & Environm Engn, Blacksburg, VA 24061 USA
[2] Columbia Univ, Fu Fdn Sch Engn & Appl Sci, New York, NY 10027 USA
[3] Univ Michigan, Ann Arbor, MI 48109 USA
基金
美国国家科学基金会;
关键词
Multiple-view geometry; Computer vision; Structure and motion; Photography; Computer-aided design (CAD); Construction management; Information technology (IT); CONSTRUCTION; 3D; INFORMATION; IMAGE; VISUALIZATION;
D O I
10.1061/(ASCE)CO.1943-7862.0000371
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The significant advancement in digital imaging and widespread popularity of digital cameras for capturing a comprehensive visual record of construction performance in the architecture, engineering, construction, and facility management (AEC/FM) industries have triggered an extensive growth in the rate of site photography, allowing hundreds of images to be stored for a project on a daily basis. Meanwhile, collaborative AEC technologies centering around building information models (BIMs) are becoming widely applied to support various architectural, structural, and preconstruction decision-making tasks. These models, if integrated with the as-built perspective of a construction, have great potential to extensively add value during the construction phase of a project. This paper reports recent developments from research efforts in (1) automated acquisition of as-built point-cloud models from unordered daily site photo collections and geo-registration of site images, (2) automated generation of four-dimensional (4D) as-built point-cloud models, and (3) semiautomated superimposition of the integrated as-built model over 4D (three dimensions plus time) BIMs to generate integrated 4D as-built and as-planned visualizations. The limitations and benefits of each modeling approach, the motivations for development of 4D augmented-reality (D(4)AR) environments for integrated visualization of as-built and as-planned models, the perceived and observed applications, and the benefits in seven case studies are discussed. Not only does a D(4)AR model visualize construction processes and performance deviations, it can also be used as a tool for automated and remote monitoring of progress and safety, quality control, and site layout management, and enables enhanced coordination and communication. DOI: 10.1061/(ASCE)CO.1943-7862.0000371. (C) 2011 American Society of Civil Engineers.
引用
收藏
页码:1099 / 1116
页数:18
相关论文
共 52 条
[1]   PHOTO-NET II: a computer-based monitoring system applied to project management [J].
Abeid, J ;
Allouche, E ;
Arditi, D ;
Hayman, M .
AUTOMATION IN CONSTRUCTION, 2003, 12 (05) :603-616
[2]   Audio/visual information in construction project control [J].
Abudayyeh, O .
ADVANCES IN ENGINEERING SOFTWARE, 1997, 28 (02) :97-101
[3]  
American Institute of Architects (AIA), 2008, E202 2008 BIM PROT E
[4]  
[Anonymous], P ASCE INT WORKSH CO
[5]  
[Anonymous], 1981, INT C ARTIFICIAL INT
[6]  
[Anonymous], 2009, MEAS MOD REAL WORLD
[7]  
[Anonymous], J BUILT HUMAN ENV RE
[8]  
[Anonymous], 2001, Robotica, DOI DOI 10.1017/S0263574700223217
[9]  
[Anonymous], 2009, YOUR PHOT AUT 3D
[10]   A METHOD FOR REGISTRATION OF 3-D SHAPES [J].
BESL, PJ ;
MCKAY, ND .
IEEE TRANSACTIONS ON PATTERN ANALYSIS AND MACHINE INTELLIGENCE, 1992, 14 (02) :239-256