共 45 条
Optimal scheduling of smart reconfigurable neighbour micro-grids
被引:18
作者:
Hemmati, Mohammad
[1
]
Ghasemzadeh, Saeid
[1
]
Mohammadi-Ivatloo, Behnam
[1
]
机构:
[1] Univ Tabriz, Fac Elect & Comp Engn, Tabriz, Iran
关键词:
power generation control;
load shedding;
power system interconnection;
renewable energy sources;
distributed power generation;
power system management;
smart power grids;
power markets;
voltage control;
distribution networks;
common area connection;
power deficiency;
power loss in interconnection switches;
reliability;
numerical results;
NMGs optimal scheduling;
smart reconfigurable neighbour microgrids;
future smart distribution networks;
MG;
overload power;
surplus power;
neighbour MGs;
power exchange management;
smart reconfigurable neighbouring microgrids;
closing switches;
optimal structure;
adjacent MGs;
exchange power;
ENERGY MANAGEMENT-SYSTEM;
NETWORK RECONFIGURATION;
MULTI-MICROGRIDS;
OUTAGE MANAGEMENT;
OPERATION;
MINIMIZATION;
DESIGN;
RELIABILITY;
PERFORMANCE;
GENERATION;
D O I:
10.1049/iet-gtd.2018.6388
中图分类号:
TM [电工技术];
TN [电子技术、通信技术];
学科分类号:
0808 ;
0809 ;
摘要:
Future smart distribution networks will include micro-grids (MGs) that are working in the neighbourhood. Owing to the penetration of renewable energy sources with probabilistic nature as well as deviation of load, MG may be faced with an overload or surplus power. The solution of this problem is to create and control a link between neighbour MGs for power exchange management. This study proposed a new framework for the optimal scheduling of smart reconfigurable neighbouring micro-grids (NMGs). Reconfiguration by managing the connection between MGs, through the opening and closing switches, finds the optimal structure of NMGs. Connectivity between NMGs is intended in two levels. In the first level, each MG can connect to adjacent MGs and exchange power, separately and without common area connection. In the second level, NMGs through a common area and opening or closing switches that couple them to the substrate can exchange power together. The objective of the study is to minimise load shedding of NMGs that are facing with power deficiency. The final structure selection is based on two different criteria (power loss in interconnection switches and reliability) point of view. The proposed method implemented on five NMGs system and numerical results show the effectiveness of the proposed NMGs optimal scheduling.
引用
收藏
页码:380 / 389
页数:10
相关论文