FLEXIBLE MANUFACTURING SYSTEMS MODELLING AND PERFORMANCE EVALUATION USING AUTOMOD

被引:21
作者
Reddy, B. S. P. [1 ]
Rao, C. S. P. [2 ]
机构
[1] Kakatiya Inst Tech & Sci, Dept Mech Engn, Warangal 15, Andhra Pradesh, India
[2] Natl Inst Technol, Dept Mech Engn, Warangal 4, Andhra Pradesh, India
关键词
Flexible Manufacturing System; Simultaneous Scheduling; Automated Guided Vehicle; Simulation; Automod; SIMULATION; MACHINES; DESIGN;
D O I
10.2507/IJSIMM10(2)3.176
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In recent times flexible manufacturing systems emerged as a powerful technology to meet the continuous changing customer demands. Increase in the performance of flexible manufacturing systems is expected as a result of integration of the shop floor activities such as machine and vehicle scheduling. The authors made an attempt to integrate machine and vehicle scheduling with an objective to minimize the makespan using Automod. Automod is a discrete event simulation package used to model and simulate a wide variety of issues in automated manufacturing systems. The key issues related to the design and operation of automated guided vehicles such as flow path layout, number of vehicles and traffic control problems are considered in the study. The performance measures like throughput, machine and vehicle utilization are studied for different job dispatching and vehicle assignment rules in different flexible manufacturing system configurations. (Received in August 2010, accepted in April 2011. This paper was with the authors 1 month for 2 revisions.)
引用
收藏
页码:78 / 90
页数:13
相关论文
共 21 条
[1]   Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies [J].
Anwar, MF ;
Nagi, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1998, 36 (03) :653-681
[2]  
CHENGLIN M, 2009, INT C INT COMP TECHN, V2, P86
[3]  
Drake GR, 1996, 1996 WINTER SIMULATION CONFERENCE PROCEEDINGS, P1083, DOI 10.1145/256562.256914
[4]   CHARACTERIZATION OF AUTOMATIC GUIDED VEHICLE DISPATCHING RULES [J].
EGBELU, PJ ;
TANCHOCO, JMA .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1984, 22 (03) :359-374
[5]  
Fisher H, 1963, IND SCHEDULING, P225
[6]  
FRITZ R, 2002, IEEE SYST ENG INF EN
[7]  
HAIJUN M, 2008, J SE U NATURAL SCI E, V38
[8]  
KIM MH, 1994, J MANUF SYST, V13, P85, DOI 10.1016/0278-6125(94)90024-8
[9]  
Lawrence S., 1984, Resource constrained project scheduling: an experimental investigation of heuristic scheduling techniques
[10]   DESIGN OF AN AUTOMATED GUIDED VEHICLE-BASED MATERIAL HANDLING-SYSTEM FOR A FLEXIBLE MANUFACTURING SYSTEM [J].
MAHADEVAN, B ;
NARENDRAN, TT .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (09) :1611-1622