Evaluation of "Autotune" calibration against manual calibration of building energy models

被引:67
作者
Chaudhary, Gaurav [1 ]
New, Joshua [2 ]
Sanyal, Jibonananda [2 ]
Im, Piljae [2 ]
O'Neill, Zheng [3 ]
Garg, Vishal [4 ]
机构
[1] Indian Inst Technol Roorkee, Dept Architecture & Planning, Roorkee, Uttarakhand, India
[2] Oak Ridge Natl Lab, Oak Ridge, TN USA
[3] Univ Alabama, Dept Mech Engn, Tuscaloosa, AL USA
[4] Int Inst Informat Technol Hyderabad, Ctr IT Bldg Sci, Hyderabad, Telangana, India
关键词
Autotune; Building energy modeling; Calibration; Energy efficient buildings; Automated calibration; SUPPORT VECTOR MACHINES; SIMULATION-MODELS; PERFORMANCE SIMULATION; BAYESIAN CALIBRATION; COMMERCIAL BUILDINGS; GRAPHICAL INDEXES; CONSUMPTION; METHODOLOGY; ELECTRICITY; RETROFIT;
D O I
10.1016/j.apenergy.2016.08.073
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper demonstrates the application of Autotune, a methodology aimed at automatically producing calibrated building energy models using measured data, in two case studies. In the first case, a building model is de-tuned by deliberately injecting faults into more than 60 parameters. This model was then calibrated using Autotune and its accuracy with respect to the original model was evaluated in terms of the industry-standard normalized mean bias error and coefficient of variation of root mean squared error metrics set forth in ASHRAE Guideline 14. In addition to whole-building energy consumption, outputs including lighting, plug load profiles, HVAC energy consumption, zone temperatures, and other variables were analyzed. In the second case, Autotune calibration is compared directly to experts' manual calibration of an emulated-occupancy, full-size residential building with comparable calibration results in much less time. The paper concludes with a discussion of the key strengths and weaknesses of auto-calibration approaches. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:115 / 134
页数:20
相关论文
共 131 条
  • [1] Uncalibrated building energy simulation modeling results
    Ahmad, Mushtaq
    Culp, Charles H.
    [J]. HVAC&R RESEARCH, 2006, 12 (04): : 1141 - 1155
  • [2] VALIDATION OF AN ALGORITHM TO DISAGGREGATE WHOLE-BUILDING HOURLY ELECTRICAL LOAD INTO END USES
    AKBARI, H
    [J]. ENERGY, 1995, 20 (12) : 1291 - 1301
  • [3] Simulation of energy consumption for Kuwaiti domestic buildings
    Al-ajmi, Faaaj F.
    Hanby, V. I.
    [J]. ENERGY AND BUILDINGS, 2008, 40 (06) : 1101 - 1109
  • [4] [Anonymous], EN EFF VER SPEC
  • [5] [Anonymous], MITIGATION POTENTIAL
  • [6] [Anonymous], ICGA
  • [7] [Anonymous], P ASHRAE DOE BTECC C
  • [8] [Anonymous], ASME 2003 INT SOL EN
  • [9] [Anonymous], ASHRAE WINT M AN
  • [10] [Anonymous], P 12 IBPSA C