Resource-constrained project scheduling: a heuristic for the multi-mode case

被引:32
作者
Heilmann, R [1 ]
机构
[1] Univ Karlsruhe, Inst Wirtschaftstheorie & Operat Res, D-76128 Karlsruhe, Germany
关键词
resource-constrained project scheduling maximum time lags; multi-mode case; heuristic;
D O I
10.1007/PL00013354
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents a heuristic solution procedure for a very general resource-constrained project scheduling problem. Here, multiple execution modes are available for the individual activities of the project. In addition, minimum as well as maximum time lags between different activities may be given. The objective is to determine a mode and a start time for each activity such that the temporal and resource constraints are met and the project duration is minimized. Project scheduling problems of this type occur e.g. in process industries. The heuristic is a multi-pass priority-rule method with backplanning which is based on an integration approach and embedded in random sampling. Its performance is evaluated within an experimental performance analysis for problem instances of real-life size with 100 activities and up to 5 modes per activity.
引用
收藏
页码:335 / 357
页数:23
相关论文
共 14 条
[1]  
[Anonymous], REV FRANCAISE RECHER
[2]  
[Anonymous], ADV PROJECT SCHEDULI
[3]  
[Anonymous], 1999, Project Scheduling
[4]  
Bartusch M., 1988, Annals of Operations Research, V16, P201
[5]   Resource-constrained project scheduling: Notation, classification, models, and methods [J].
Brucker, P ;
Drexl, A ;
Mohring, R ;
Neumann, K ;
Pesch, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) :3-41
[6]   SCHEDULING OF PROJECT NETWORKS BY JOB ASSIGNMENT [J].
DREXL, A .
MANAGEMENT SCIENCE, 1991, 37 (12) :1590-1602
[7]   NONPREEMPTIVE MULTIMODE RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
DREXL, A ;
GRUENEWALD, J .
IIE TRANSACTIONS, 1993, 25 (05) :74-81
[8]  
Herroelen W., 1999, Project Scheduling, P1
[9]   Characterization and generation of a general class of resource-constrained project scheduling problems [J].
Kolisch, R ;
Sprecher, A ;
Drexl, A .
MANAGEMENT SCIENCE, 1995, 41 (10) :1693-1703
[10]  
Kolisch R, 1997, IIE TRANS, V29, P987