A novel two-phase decomposition-based algorithm to solve MINLP pipeline scheduling problem

被引:6
作者
Asl, Neda Beheshti [1 ]
MirHassani, S. A. [1 ]
Relvas, S. [2 ]
Hooshmand, F. [1 ]
机构
[1] Amirkabir Univ Technol, Fac Math & Comp Sci, 424 Hafez Ave,Valiasr Sq, Tehran, Iran
[2] Univ Lisbon, CEG IST Ctr Management Studies, Inst Super Tecn, P-1049001 Lisbon, Portugal
基金
美国国家科学基金会;
关键词
Two-phase decomposition-based heuristic; MINLP model; Continuous-time model; Multi-product pipeline scheduling; Stable flow-rate; REFINED PRODUCTS PIPELINES; MULTIPRODUCT PIPELINE; INVENTORY MANAGEMENT; SINGLE-SOURCE; MILP MODEL; FORMULATION; SYSTEMS;
D O I
10.1007/s12351-022-00738-6
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Decomposition-based algorithms have been successfully applied in the literature to solve NP-hard optimization problems. This paper presents an efficient decomposition-based heuristic to solve a new variant of the pipeline scheduling problem in which, besides minimizing the interface and demand shortage, the flow-rate stability of batches is also taken into account. Flow-rate stability has a great impact on the reduction of the energy consumed by pumping, and to the best of our knowledge, it has not been addressed in the continuous-time models of the pipeline scheduling problem. Thus, from the modeling perspective, a new continuous-time mixed-integer nonlinear programming (MINLP) model is developed, and from the solution viewpoint, nonlinear terms are remedied by a decomposition technique. Computational results over real-world case studies and randomly generated instances confirm that the proposed method is able to generate near-optimal solutions within a short amount of time; further, they show that the proposed model can result in more stable flow-rates compared to existing models.
引用
收藏
页码:4829 / 4863
页数:35
相关论文
共 44 条
  • [11] Product-centric continuous-time formulation for pipeline scheduling
    Castro, Pedro M.
    Mostafaei, Hossein
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2017, 104 : 283 - 295
  • [12] Optimizing detailed schedules of a multiproduct pipeline by a monolithic MILP formulation
    Chen, Haihong
    Zuo, Lili
    Wu, Changchun
    Wang, Li
    Diao, Feng
    Chen, Jie
    Huang, Yanfei
    [J]. JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2017, 159 : 148 - 163
  • [13] Multiproduct pipeline scheduling integrating for inbound and outbound inventory management
    Dimas, Diovanina
    Murata, Valeria V.
    Neiro, Sergio M. S.
    Relvas, Susana
    Barbosa-Povoa, Ana Paula
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2018, 115 : 377 - 396
  • [14] A branch-and-cut algorithm for Mixed-Integer Bilinear Programming
    Fischetti, Matteo
    Monaci, Michele
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 282 (02) : 506 - 514
  • [15] Aggregation error for location models: survey and analysis
    Francis, R. L.
    Lowe, T. J.
    Rayco, M. B.
    Tamir, A.
    [J]. ANNALS OF OPERATIONS RESEARCH, 2009, 167 (01) : 171 - 208
  • [16] SEQUENCING INPUTS TO MULTICOMMODITY PIPELINES
    HANE, CA
    RATLIFF, HD
    [J]. ANNALS OF OPERATIONS RESEARCH, 1995, 57 : 73 - 101
  • [17] An integer linear programming approach for a class of bilinear integer programs
    Hu, Wuhua
    Tay, Wee Peng
    [J]. OPERATIONS RESEARCH LETTERS, 2014, 42 (03) : 226 - 230
  • [18] Jittamai P., 2004, THESIS TEXAS A M U T
  • [19] Planning of multi-product pipelines by economic lot scheduling models
    Kirschstein, Thomas
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 264 (01) : 327 - 339
  • [20] An MILP approach for detailed scheduling of multi-product pipeline in pressure control mode
    Liao, Qi
    Liang, Yongtu
    Xu, Ning
    Zhang, Haoran
    Wang, Junao
    Zhou, Xingyuan
    [J]. CHEMICAL ENGINEERING RESEARCH & DESIGN, 2018, 136 : 620 - 637