Neoliberal Experiments with Urban Infrastructure: The Cross City Tunnel, Sydney

被引:55
作者
Haughton, Graham [1 ]
McManus, Phil [2 ]
机构
[1] Univ Manchester, Sch Environm & Dev, Manchester M13 9PL, Lancs, England
[2] Univ Sydney, Sch Geosci, Sydney, NSW 2006, Australia
关键词
neoliberalism; infrastructure; policy learning; state; public private partnerships; Sydney; Australia; PUBLIC-PRIVATE PARTNERSHIPS; SUSTAINABLE DEVELOPMENT; FIX;
D O I
10.1111/j.1468-2427.2011.01019.x
中图分类号
P9 [自然地理学]; K9 [地理];
学科分类号
0705 ; 070501 ;
摘要
In this article, we explore a particular variant of neoliberal thought by analysing the proposal, design, funding and operation of an element of transport infrastructure in Sydney, Australia that was developed as a publicprivate partnership (PPP). Although there has been considerable work on the theoretical advantages and disadvantages of PPPs, there has been little empirically informed critical analysis of how PPPs operate in practice, and even less on how environmental arguments are selectively used to justify PPPs. The Cross City Tunnel (CCT) is one of Australia's most controversial examples of urban transport infrastructure. Although an engineering success, the CCT was far from being environmentally sustainable, socially just or economically viable. The CCT reveals the contradictions of neoliberal policy regimes, shallow sustainability rhetoric, the inappropriateness of the PPP model for other urban infrastructure developments in Sydney and internationally, and a capacity on the part of the partners to learn inappropriate lessons.
引用
收藏
页码:90 / 105
页数:16
相关论文
共 48 条
[1]  
Allen Consulting Group, 2007, PERF PPPS TRAD PROC
[2]  
Allen L., 2002, AUSTR FINANCIAL 0208, P61
[3]  
Allen L., 2001, AUSTR FINANCIAL 1106, P47
[4]   Green subjection: The politics of neoliberal urban environmental management [J].
Brand, Peter .
INTERNATIONAL JOURNAL OF URBAN AND REGIONAL RESEARCH, 2007, 31 (03) :616-632
[5]   From neoliberalism to neoliberalisation: consolations, confusions, and necessary illusions [J].
Castree, N .
ENVIRONMENT AND PLANNING A, 2006, 38 (01) :1-6
[6]  
Ernst and Young Transaction Advisory Services Limited, 2008, EC CONTR SYDN TOLL R
[7]   Underestimating costs in public works projects - Error or lie? [J].
Flyvbjerg, B ;
Holm, MS ;
Buhl, S .
JOURNAL OF THE AMERICAN PLANNING ASSOCIATION, 2002, 68 (03) :279-295
[8]  
Freestone R., 2008, FLORENCE TAYLORS HAT
[9]  
GIBBS D, 2002, 3 U HULL DEP GEOGR
[10]  
Greiner N., 2007, COMMUNICATION 0222