Incorporating Multi-Area Reliability Concepts to the Evaluation of the Brazilian Power System Capacity to Supply the Peak Load
被引:0
作者:
Justino, T. C.
论文数: 0引用数: 0
h-index: 0
机构:
CEPEL Elect Energy Res Ctr, Rio De Janeiro, BrazilCEPEL Elect Energy Res Ctr, Rio De Janeiro, Brazil
Justino, T. C.
[1
]
Marzano, L. G. B.
论文数: 0引用数: 0
h-index: 0
机构:
CEPEL Elect Energy Res Ctr, Rio De Janeiro, BrazilCEPEL Elect Energy Res Ctr, Rio De Janeiro, Brazil
Marzano, L. G. B.
[1
]
Melo, A. C. G.
论文数: 0引用数: 0
h-index: 0
机构:
CEPEL Elect Energy Res Ctr, Rio De Janeiro, Brazil
UERJ State Univ Rio de Janeiro, Rio De Janeiro, BrazilCEPEL Elect Energy Res Ctr, Rio De Janeiro, Brazil
Melo, A. C. G.
[1
,2
]
Maceira, M. E. P.
论文数: 0引用数: 0
h-index: 0
机构:
CEPEL Elect Energy Res Ctr, Rio De Janeiro, Brazil
UERJ State Univ Rio de Janeiro, Rio De Janeiro, BrazilCEPEL Elect Energy Res Ctr, Rio De Janeiro, Brazil
Maceira, M. E. P.
[1
,2
]
Batista, F. R. S.
论文数: 0引用数: 0
h-index: 0
机构:
CEPEL Elect Energy Res Ctr, Rio De Janeiro, BrazilCEPEL Elect Energy Res Ctr, Rio De Janeiro, Brazil
Batista, F. R. S.
[1
]
机构:
[1] CEPEL Elect Energy Res Ctr, Rio De Janeiro, Brazil
[2] UERJ State Univ Rio de Janeiro, Rio De Janeiro, Brazil
来源:
2016 POWER SYSTEMS COMPUTATION CONFERENCE (PSCC)
|
2016年
This paper discusses the adoption of multi-area reliability concepts in the evaluation of Brazilian power system capacity to supply the peak load. In the assessment of the interconnected hydrothermal power systems reliability it is adopted a computational model that takes into account uncertainties on the streamflows into the hydro plants reservoirs, random forced outages of generating units and interconnections among subsystems, system load curve and programmed outage of generating units. The model allows both single area and multi-area analysis. The calculated reliability indices can help the identification of possible power system deficiencies to supply the forecasted maximum peak load as well as the computation of power marginal costs in libelarized electricity markets. In addition, it is discussed an approach to estimate the maximum peak load that a hydrothermal generation system can supply considering a multi-area reliability criterion based on adequacy analysis. The obtained results encourage the continuity of studies seeking the establishment of such criterion for hydrothermal interconnected systems.