Experimental results and simulation with TRNSYS of a 7.2 kWp grid-connected photovoltaic system

被引:53
|
作者
Quesada, B. [1 ]
Sanchez, C. [1 ]
Canada, J. [2 ]
Royo, R. [1 ]
Paya, J. [1 ]
机构
[1] Univ Politecn Valencia, IIE, Valencia 46022, Spain
[2] Univ Politecn Valencia, Dept Termodinam Aplicada, E-46071 Valencia, Spain
关键词
Monocrystalline PV; Experimental installation; Model; TRNSYS; PERFORMANCE; MODULES; DESIGN; MODELS;
D O I
10.1016/j.apenergy.2010.12.011
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper presents a dynamic model and experimental results of a 7.2 kWp photovoltaic (PV) installation located at the Polytechnic University of Valencia (Spain). The modelling of the monocrystalline cells has been realised in TRNSYS and has been validated during an extensive experimental campaign from January 2001 to March 2003, using the data of a fully monitored PV field. The simulation results with TRNSYS provide an accurate prediction of the long-term performance. In addition to the dynamic models, algebraic methods such as the constant fill factor have also been applied. In the design of PV systems, there are several important uncertainties which have to be taken into account, such as the reduction of power with respect to the nominal power under Standard Test Conditions (STC), the choice of the meteorological database, and the models for the calculation of the radiation on tilted surface and of the cell temperature. These aspects are analyzed thoroughly in this paper, as well as the problems inherent to the PV power injection into the grid. (C) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1772 / 1783
页数:12
相关论文
共 50 条
  • [21] Grid-Connected Photovoltaic Generation Plants Components and Operation
    Romero-Cadaval, Enrique
    Spagnuolo, Giovanni
    Franquelo, Leopoldo G.
    Ramos-Paja, Carlos-Andres
    Suntio, Teuvo
    Xiao, Weidong-Michael
    IEEE INDUSTRIAL ELECTRONICS MAGAZINE, 2013, 7 (03) : 6 - 20
  • [22] Performance of a 500 kWP grid connected photovoltaic system at Mae Hong Son Province, Thailand
    Chokmaviroj, S
    Wattanapong, R
    Suchart, Y
    RENEWABLE ENERGY, 2006, 31 (01) : 19 - 28
  • [23] Performance assessment of a 400 kWp multi- technology photovoltaic grid-connected pilot plant in arid region of Algeria
    Chikh, Madjid
    Berkane, Smain
    Mahrane, Achour
    Sellami, Rabah
    Yassaa, Noureddine
    RENEWABLE ENERGY, 2021, 172 : 488 - 501
  • [24] Optimal sizing of a hybrid grid-connected photovoltaic and wind power system
    Gonzalez, Arnau
    Riba, Jordi-Roger
    Rius, Antoni
    Puig, Rita
    APPLIED ENERGY, 2015, 154 : 752 - 762
  • [25] Energy assessment and economic sensitivity analysis of a grid-connected photovoltaic system
    Cui, Yuanlong
    Zhu, Jie
    Meng, Fanran
    Zoras, Stamatis
    McKechnie, Jon
    Chu, Junze
    RENEWABLE ENERGY, 2020, 150 : 101 - 115
  • [26] Electrical sizing of grid-connected photovoltaic systems
    Ilica, Ahmet
    Serdar, Muhammed
    PAMUKKALE UNIVERSITY JOURNAL OF ENGINEERING SCIENCES-PAMUKKALE UNIVERSITESI MUHENDISLIK BILIMLERI DERGISI, 2024, 30 (04): : 451 - 462
  • [27] Performance Prediction of a Grid-Connected Photovoltaic Plant
    Bouzerdoum, M.
    Mellit, A.
    2017 5TH INTERNATIONAL CONFERENCE ON ELECTRICAL ENGINEERING - BOUMERDES (ICEE-B), 2017,
  • [28] A Modular Grid-Connected Photovoltaic Generation System Based on DC Bus
    Zhang, Li
    Sun, Kai
    Xing, Yan
    Feng, Lanlan
    Ge, Hongjuan
    IEEE TRANSACTIONS ON POWER ELECTRONICS, 2011, 26 (02) : 523 - 531
  • [29] An improved model and performance analysis for grid-connected photovoltaic system in Oman
    Al-Shahri, Omar A.
    Ismail, Firas B.
    Al-Muhsen, Nizar F. O.
    Al-Bazi, Ammar
    Hannan, M. A.
    HELIYON, 2022, 8 (12)
  • [30] Hybrid photovoltaic/diesel green ship operating in standalone and grid-connected mode - Experimental investigation
    Lee, Kyoung-Jun
    Shin, Dongsul
    Yoo, Dong-Wook
    Choi, Han-Kyu
    Kim, Hee-Je
    ENERGY, 2013, 49 : 475 - 483