Comprehensive Foundation Rehabilitation at Bear Creek Dam

被引:3
|
作者
Charlton, John E. [1 ]
Ginther, Conrad [1 ]
Bruce, Donald A. [2 ]
机构
[1] Paul C Rizzo Associates, Columbia, SC 29210 USA
[2] Geosystems LP, Venetia, PA 15367 USA
来源
关键词
Packstone; Grouting; Dental Concrete; Cutoff Panel; Karst;
D O I
10.2113/gseegeosci.16.3.211
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The Tennessee Valley Authority (TVA) Bear Creek Dam is a high-hazard potential embankment dam in northwest Alabama that provides water supply, flood control, and recreation benefits. Since its initial filling in 1969, the dam has experienced significant seepage through its karst limestone foundation. After experiencing limited or temporary success at controlling seepage using supplemental grouting programs and downstream seepage collection systems, TVA elected to embark on an extensive rehabilitation effort for the existing dam's deficiencies, as follows: (1) foundation seepage leading to a potential loss of embankment material at the foundation contact and (2) the potential loss of the embankment dam as a result of overtopping during the potential maximum flood (PMF). Paul C. Rizzo Associates, Inc., was hired to design a permanent solution for the dam's deficiencies. Performance of this rehabilitation consists of construction of a downstream roller-compacted concrete reinforcement structure to prevent loss of the dam during PMF overtopping and installation of a composite seepage barrier consisting of a two-line grout curtain with cutoff wall panels at select locations to reduce potentially hazardous foundation seepage. The existing emergency spillway as well as the existing sluiceway tunnel and associated intake structure were preserved as a part of this new construction. This article presents the means and methods employed to effectively treat the karst limestone geology present at the Bear Creek Dam, with emphasis on the evolving nature of the design and construction of the final seepage barrier, whereby continuous, 'real-time' evaluation of the geologic conditions encountered during each phase of the foundation treatment process was used to tailor the scope and design of the next step of the rehabilitation.
引用
收藏
页码:211 / 227
页数:17
相关论文
共 50 条
  • [42] AMERICAN REHABILITATION FOUNDATION
    SCHWANKE, RW
    JOURNAL OF REHABILITATION, 1960, 26 (05) : 19 - 19
  • [43] Deer Creek Dam Modifications Completed ahead Of Schedule
    Cardno, Catherine A.
    CIVIL ENGINEERING, 2009, 79 (03): : 16 - 17
  • [44] REMEDIAL TREATMENT EXPLORATION, WOLF CREEK DAM, KY
    SIMMONS, MD
    JOURNAL OF THE GEOTECHNICAL ENGINEERING DIVISION-ASCE, 1982, 108 (07): : 966 - 981
  • [45] The Landslide Dam of Ventia Creek (Umbria, Central Italy)
    Cencetti, Corrado
    De Rosa, Pierluigi
    Fredduzzi, Andrea
    ENGINEERING GEOLOGY FOR SOCIETY AND TERRITORY, VOL 2: LANDSLIDE PROCESSES, 2015, : 1125 - 1128
  • [46] The landslide dam of Ventia Creek (Umbria, central Italy)
    Brigante, Raffaella
    Cencetti, Corrado
    De Rosa, Pierluigi
    Fredduzzi, Andrea
    Radicioni, Fabio
    Stoppini, Aurelio
    RENDICONTI ONLINE SOCIETA GEOLOGICA ITALIANA, 2013, 24 : 37 - 39
  • [47] Rehabilitation and upgrading of the Kibling Dam
    Eberl, Felix
    Mexis, Christoph
    Muckenthaler, Peter
    Strobl, Theodor
    WASSERWIRTSCHAFT, 2018, 108 (06) : 25 - 29
  • [48] The rehabilitation of Luxhay Dam, Somerset
    Millmore, JP
    Stables, JF
    Shannon, FE
    PROSPECT FOR RESERVOIRS IN THE 21ST CENTURY, 1998, : 265 - 275
  • [49] Tibble fork dam rehabilitation
    Price, Jacob S.
    Price, Bradford E.
    Johnson, S. Robert
    Horrocks, Brandon D.
    2017 ASDSO - Dam Safety, Conference Proceedings, 2017, : 978 - 994
  • [50] Environmentally rehabilitation of dam Bitdalen
    Ruud, A. M.
    Lia, L.
    DAMS AND RESERVOIRS UNDER CHANGING CHALLENGES, 2011, : 799 - 805