Risk management in distributed wind energy implementing Analytic Hierarchy Process

被引:70
|
作者
Zhou, Shan [1 ]
Yang, Pu [1 ]
机构
[1] UCL, Bartlett Sch Construct & Project Management, London WC1E 7HB, England
关键词
Distributed wind energy; Risk management; PEST analysis; Analytic hierarchy process (AHP); Quantitative risk analysis; MULTICRITERIA DECISION-MAKING; REAL OPTIONS; GENERATION; INDUSTRY; SYSTEMS; IDENTIFICATION; MULTIPLE; PROJECTS; BENEFITS; ONSHORE;
D O I
10.1016/j.renene.2019.12.125
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Distributed wind power has received growing attention in recent years. However, high risks remain in its investigation, which severely hindered its development. This study attempts to gather and identify risk factors in distributed wind power through literature reviews and rank the risks based on expert opinions. Based on previous literature, we classified risk for distributed wind power investment into four types, namely the political risks, economic risks, social risks, and technical risks. Analytic Hierarchy Process (AHP) method is used to assess risks in the life cycle of the distributed wind farm. Political, Economic, Social and Technical methodology as the criteria hierarchy is introduced to classify the identified risks as the sub-criteria hierarchy in the AHP model. The result shows that the risk of changes in electricity price policy is the most critical impact on the distributed wind power system to obtain sustainable development and make profits. Therefore, the government needs to provide a long-term vision of electricity price policy to promote the development of distributed wind projects. (C) 2020 Elsevier Ltd. All rights reserved.
引用
收藏
页码:616 / 623
页数:8
相关论文
共 50 条
  • [1] Project Risk Management Based on Analytic Hierarchy Process
    Deng, Fei-yang
    2018 3RD INTERNATIONAL CONFERENCE ON AUTOMATION, MECHANICAL AND ELECTRICAL ENGINEERING (AMEE 2018), 2018, 298 : 614 - 620
  • [2] Sparse and distributed Analytic Hierarchy Process
    Oliva, Gabriele
    Setola, Roberto
    Scala, Antonio
    AUTOMATICA, 2017, 85 : 211 - 220
  • [3] Risk Management in Implementing Wind Energy Project
    Rolik, Yurii
    PROCEEDINGS OF THE 16TH INTERNATIONAL SCIENTIFIC CONFERENCE RELIABILITY AND STATISTICS IN TRANSPORTATION AND COMMUNICATION (RELSTAT-2016), 2017, 178 : 278 - 288
  • [4] Assessment of Barriers to Wind Energy Development Using Analytic Hierarchy Process
    Das, Priyom
    Amin, S. M. Mezbahul
    Lipu, Molla Shahadat Hossain
    Urooj, Shabana
    Ashique, Ratil H.
    Al Mansur, Ahmed
    Islam, Md. Tariqul
    SUSTAINABILITY, 2023, 15 (22)
  • [5] Risk Analysis of Wind Power Projects Based on Analytic Hierarchy Process
    Xing, Lixian
    Han, Bin
    2010 CONFERENCE ON ENERGY STRATEGY AND TECHNOLOGY (CEST 2010), 2010, : 113 - 116
  • [6] Implementing the balanced scorecard using the analytic hierarchy process & the analytic network process
    Leung, L. C.
    Lam, K. C.
    Cao, D.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2006, 57 (06) : 682 - 691
  • [7] GIS Based Fuzzy Analytic Hierarchy Process for wind Energy Sites Selection
    Elmahmoudi, Fatma
    Abra, Oum Elkheir
    Raihani, Abdelhadi
    Serrar, Ouafae
    Bahatti, Lhousine
    2019 INTERNATIONAL CONFERENCE ON ADVANCED COMMUNICATION TECHNOLOGIES AND NETWORKING (COMMNET), 2019, : 168 - 175
  • [8] Risk management of engineering projects installation using analytic hierarchy process
    Wu, Hanmei
    Cai, Xiaoqing
    Feng, Man
    INFRASTRUCTURE ASSET MANAGEMENT, 2024,
  • [9] Risk management of engineering projects installation using Analytic Hierarchy Process
    Wu, Hanmei
    Cai, Xiaoqing
    Feng, Man
    INFRASTRUCTURE ASSET MANAGEMENT, 2025, 12 (01) : 57 - 69
  • [10] Risk Management of Road Engineering Project Based on Analytic Hierarchy Process
    Chen, Shanxiang
    Luo, Xu
    Li, Xinping
    Fu, Xinsha
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2022, 29 (02): : 363 - 368