Variation law of segment strain increment of an underwater shield tunnel during normal operation

被引:0
作者
Yang Jian-ping [1 ]
Wang Chen [2 ]
Huang Yu-cheng [3 ]
Qin Chuan [3 ]
Chen Wei-zhong [1 ]
机构
[1] Chinese Acad Sci, Inst Rock & Soil Mech, State Key Lab Geomech & Geotech Engn, Wuhan 430071, Hubei, Peoples R China
[2] China Commun Construct Corp Ltd, Gen Contracting Branch, Beijing 100088, Peoples R China
[3] Wuhan Yangtze River Tunnel Construct Co Ltd, Wuhan 430062, Hubei, Peoples R China
基金
中国国家自然科学基金;
关键词
shield tunnel; structural health monitoring; segment strain; statistic method; early warning; threshold value;
D O I
10.16285/j.rsm.2021.1752
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The structural abnormal response of underwater shield tunnel under operation is the prerequisite of structural abnormality early warning. Based on the monitoring segment strains of typical sections of the Wuhan Yangtze River tunnel during normal operation period (2013-2020), the distributions of strain increments, the relations of strain increment with temperature increment and water level increment, and relations of strain increments between adjacent segments (i.e. spatial effects) are thoroughly studied. An early warning method of structural abnormal response based on strain increment is proposed and the corresponding early warning threshold value is determined. Study results show that: 1) The distribution of strain increments does not obey the normal distribution but has a fat-tail. The exponential distribution can be used to describe the distribution of the absolute value of the strain increment. 2) The temporal strain increment is difficult to predict, but its variation range can be well determined through statistical analysis. Thus, an early warning method for structural abnormality is proposed based on the monitoring strain increment of a single measuring point, and its threshold value is determined. 3) There is a deformation mode of "one expand, the other contract" between adjacent segments during normal operation, which means the strain increases of one segment but decreases of the adjacent segment. This spatial effect constraints the average strain increments of adjacent segments in a relatively small variation range. Thus, another early warning method can be developed based on the monitoring strain increments of several adjacent measuring points, and its threshold value is determined.
引用
收藏
页码:2253 / 2262
页数:10
相关论文
共 18 条
[1]   Structural health monitoring of underground facilities - Technological issues and challenges [J].
Bhalla, S ;
Yang, YW ;
Zhao, J ;
Soh, CK .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2005, 20 (05) :487-500
[2]  
[陈卫忠 Chen Weizhong], 2018, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V37, P1
[3]   Shield tunnel uplift and deformation characterisation: A case study from Zhengzhou metro [J].
Chen, Wen-Chieh ;
Song, Zhan-Ping ;
Tian, Wei ;
Wang, Zhi-Feng .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 79 :83-95
[4]  
Huang J., 2013, RES APPL HLTH MONITO
[5]   Maintenance of the undersea section of the Seikan Tunnel [J].
Ikuma, M .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2005, 20 (02) :143-149
[6]   Road tunnels in Japan: Deterioration and countermeasures [J].
Inokuma, A ;
Inano, S .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1996, 11 (03) :305-309
[7]  
LI Chang-jun., 2017, STUDY STRUCTURAL HLT
[8]  
[李聪 Li Cong], 2016, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V35, P1407
[9]  
Li M, 2016, ROCK SOIL MECH, V37, P1208, DOI 10.16285/j.rsm.2016.04.036
[10]  
LI Ming., 2015, LONG TERM HLTH MONIT