ITER plasma control system final design and preparation for first plasma

被引:17
|
作者
Snipes, J. A. [1 ]
de Vries, P. C. [1 ]
Gribov, Y. [1 ]
Henderson, M. A. [1 ]
Hunt, R. [1 ]
Loarte, A. [1 ]
Nunes, I [1 ]
Pitts, R. A. [1 ]
Sinha, J. [1 ]
Zabeo, L. [1 ]
Lee, W-R [1 ]
Ambrosino, G. [2 ]
Cinque, M. [2 ]
de Tommasi, G. [2 ]
Mattei, M. [2 ]
Pironti, A. [2 ]
Bremond, S. [3 ]
Moreau, P. [3 ]
Nouailletas, R. [3 ]
Felton, R. [4 ]
Rimini, F. [4 ]
Humphreys, D. [5 ]
Walker, M. L. [5 ]
Kavin, A. [6 ]
Lamzin, E. [6 ]
Mineev, A. [6 ]
Khayrutdinov, R. [7 ]
Konovalov, S. [7 ]
Lukash, V [7 ]
Raupp, G. [8 ]
Treutterer, W. [8 ]
机构
[1] ITER Org, St Paul Les Durance, France
[2] Consorzio CREATE, Naples, Italy
[3] CEA IRFM, St Paul Les Durance, France
[4] CCFE Fus Assoc, Culham Sci Ctr, Abingdon, Oxon, England
[5] Gen Atom, San Diego, CA USA
[6] Joint Stock Co DV Efremov Inst Electrophys Appara, St Petersburg, Russia
[7] Natl Res Ctr, Kurchatov Inst, Moscow, Russia
[8] Max Planck Inst Plasma Phys, Garching, Germany
关键词
ITER; plasma control; plasma operations; commissioning;
D O I
10.1088/1741-4326/ac2339
中图分类号
O35 [流体力学]; O53 [等离子体物理学];
学科分类号
070204 ; 080103 ; 080704 ;
摘要
The ITER plasma control system (PCS) has successfully completed its final design for the first plasma (FP) and engineering operations (EOs) phase and plant system commissioning has begun as ITER prepares for this first operation phase. Commissioning of the essential plant systems will continue as each plant system is completed and made ready for operation. Tokamak assembly has begun with the base and lower cylinder of the cryostat and the lower most poloidal field (PF) coil installed in the tokamak pit. The first vacuum vessel (VV) sector and accompanying two toroidal field (TF) coils are being prepared for transfer to the pit. Once the tokamak is assembled, the cryostat top lid is closed and pump down begins, this will start approximately one year of integrated commissioning (IC) to prepare all of the relevant plant systems for FP operation. After a scheduled one month of plasma operation with the goal of achieving a plasma current > 100 kA for at least 100 ms, there will be about six months of EO to complete commissioning of the superconducting central solenoid, PF, and TF magnet systems to full current, without plasma, to complete this initial ITER operation phase. The PCS final design for FP will be described as well as the IC sequence of the main plant systems required for this operations phase. The plans for the FP operation campaign will be described, including specific challenges present on ITER due to large VV eddy currents, issues associated with electron cyclotron heating (ECH) assist, neutral pressure and impurities. This will be followed by the EO phase to commission full current operation of the superconducting magnets, possibly including plasma operation at full TF of 5.3 T to have improved conditions both for Ohmic plasma initiation and ECH absorption.
引用
收藏
页数:9
相关论文
共 50 条
  • [41] Plasma vertical stabilisation in ITER
    Gribov, Y.
    Kavin, A.
    Lukash, V.
    Khayrutdinov, R.
    Huijsmans, G. T. A.
    Loarte, A.
    Snipes, J. A.
    Zabeo, L.
    NUCLEAR FUSION, 2015, 55 (07)
  • [42] First Wall Heat Load Control Design for ITER With a Model-Based Approach
    Pesamosca, Federico
    Ravensbergen, Timo
    Pitts, Richard A.
    de Vries, Peter
    Zabeo, Luca
    Pangione, Luigi
    Carvalho, Ivo S.
    Aumeunier, Marie-Helene
    Brank, Matic
    Mattei, Massimiliano
    Pironti, Alfredo
    IEEE TRANSACTIONS ON PLASMA SCIENCE, 2024, 52 (09) : 3853 - 3858
  • [43] The Core-Plasma CXRS Diagnostic for ITER: An Introduction to the Current Design
    Philippe Mertens
    Journal of Fusion Energy, 2019, 38 : 264 - 282
  • [44] The Core-Plasma CXRS Diagnostic for ITER: An Introduction to the Current Design
    Mertens, Philippe
    JOURNAL OF FUSION ENERGY, 2019, 38 (3-4) : 264 - 282
  • [45] PHYSICS OF PLASMA CONTROL TOWARD STEADY-STATE OPERATION OF ITER
    Kikuchi, M.
    Campbell, D. J.
    FUSION SCIENCE AND TECHNOLOGY, 2011, 59 (03) : 440 - 468
  • [46] DIII-D Integrated plasma control solutions for ITER and next-generation tokamaks
    Humphreys, D. A.
    Ferron, J. R.
    Hyatt, A. W.
    La Haye, R. J.
    Leuer, J. A.
    Penaflor, B. G.
    Walker, M. L.
    Welander, A. S.
    In, Y.
    FUSION ENGINEERING AND DESIGN, 2008, 83 (2-3) : 193 - 197
  • [47] Design and Architecture of SST-1 basic plasma control system
    Patel, Kirit
    Raju, D.
    Dhongde, J.
    Mahajan, K.
    Chudasama, H.
    Gulati, H.
    Chauhan, A.
    Masand, H.
    Bhandarkar, M.
    Pradhan, S.
    FUSION ENGINEERING AND DESIGN, 2016, 112 : 703 - 709
  • [48] The ITER limiter support system with controlled position of the plasma facing modules
    Rozov, V
    Cardella, A
    Ioki, K
    FUSION ENGINEERING AND DESIGN, 2005, 73 (01) : 57 - 82
  • [49] Final design of the Korean AC/DC converters for the ITER coil power supply system
    Oh, Jong-Seok
    Choi, Jungwan
    Suh, Jae-Hak
    Choi, Jihyun
    Lee, Lacksang
    Kim, Changwoo
    Park, Hyungjin
    Jo, Seongman
    Lee, Seungyun
    Hwang, Kwangcheol
    Liu, Hyoyol
    Hong, Ki-Don
    Sim, Dong-Joon
    Lee, Jang-Soo
    Lee, Eui-Jae
    Kwon, Yang-Hae
    Lee, Dae-Yeol
    Ko, Ki-Won
    Kim, Jong-Min
    Song, Inho
    Reynaud, Pascal
    Tan, Hao
    Tao, Jun
    Goff, Jeremy
    FUSION ENGINEERING AND DESIGN, 2015, 98-99 : 1127 - 1130
  • [50] ITER breakdown and plasma initiation revisited
    de Vries, P. C.
    Gribov, Y.
    NUCLEAR FUSION, 2019, 59 (09)