ITER plasma control system final design and preparation for first plasma

被引:17
|
作者
Snipes, J. A. [1 ]
de Vries, P. C. [1 ]
Gribov, Y. [1 ]
Henderson, M. A. [1 ]
Hunt, R. [1 ]
Loarte, A. [1 ]
Nunes, I [1 ]
Pitts, R. A. [1 ]
Sinha, J. [1 ]
Zabeo, L. [1 ]
Lee, W-R [1 ]
Ambrosino, G. [2 ]
Cinque, M. [2 ]
de Tommasi, G. [2 ]
Mattei, M. [2 ]
Pironti, A. [2 ]
Bremond, S. [3 ]
Moreau, P. [3 ]
Nouailletas, R. [3 ]
Felton, R. [4 ]
Rimini, F. [4 ]
Humphreys, D. [5 ]
Walker, M. L. [5 ]
Kavin, A. [6 ]
Lamzin, E. [6 ]
Mineev, A. [6 ]
Khayrutdinov, R. [7 ]
Konovalov, S. [7 ]
Lukash, V [7 ]
Raupp, G. [8 ]
Treutterer, W. [8 ]
机构
[1] ITER Org, St Paul Les Durance, France
[2] Consorzio CREATE, Naples, Italy
[3] CEA IRFM, St Paul Les Durance, France
[4] CCFE Fus Assoc, Culham Sci Ctr, Abingdon, Oxon, England
[5] Gen Atom, San Diego, CA USA
[6] Joint Stock Co DV Efremov Inst Electrophys Appara, St Petersburg, Russia
[7] Natl Res Ctr, Kurchatov Inst, Moscow, Russia
[8] Max Planck Inst Plasma Phys, Garching, Germany
关键词
ITER; plasma control; plasma operations; commissioning;
D O I
10.1088/1741-4326/ac2339
中图分类号
O35 [流体力学]; O53 [等离子体物理学];
学科分类号
070204 ; 080103 ; 080704 ;
摘要
The ITER plasma control system (PCS) has successfully completed its final design for the first plasma (FP) and engineering operations (EOs) phase and plant system commissioning has begun as ITER prepares for this first operation phase. Commissioning of the essential plant systems will continue as each plant system is completed and made ready for operation. Tokamak assembly has begun with the base and lower cylinder of the cryostat and the lower most poloidal field (PF) coil installed in the tokamak pit. The first vacuum vessel (VV) sector and accompanying two toroidal field (TF) coils are being prepared for transfer to the pit. Once the tokamak is assembled, the cryostat top lid is closed and pump down begins, this will start approximately one year of integrated commissioning (IC) to prepare all of the relevant plant systems for FP operation. After a scheduled one month of plasma operation with the goal of achieving a plasma current > 100 kA for at least 100 ms, there will be about six months of EO to complete commissioning of the superconducting central solenoid, PF, and TF magnet systems to full current, without plasma, to complete this initial ITER operation phase. The PCS final design for FP will be described as well as the IC sequence of the main plant systems required for this operations phase. The plans for the FP operation campaign will be described, including specific challenges present on ITER due to large VV eddy currents, issues associated with electron cyclotron heating (ECH) assist, neutral pressure and impurities. This will be followed by the EO phase to commission full current operation of the superconducting magnets, possibly including plasma operation at full TF of 5.3 T to have improved conditions both for Ohmic plasma initiation and ECH absorption.
引用
收藏
页数:9
相关论文
共 50 条
  • [31] ITER assembly phase: Progress toward first plasma
    Bigot, Bernard
    FUSION ENGINEERING AND DESIGN, 2021, 164
  • [32] ITER construction and manufacturing progress toward first plasma
    Bigot, Bernard
    FUSION ENGINEERING AND DESIGN, 2019, 146 : 124 - 129
  • [33] Plasma cleaning of steam ingressed ITER first mirrors
    Soni, Kunal
    Moser, Lucas
    Steiner, Roland
    Mathys, Daniel
    Le Guern, Frederic
    Piqueras, Juan
    Marot, Laurent
    Meyer, Ernst
    NUCLEAR MATERIALS AND ENERGY, 2019, 21
  • [34] Design concepts for KSTAR plasma control system
    Jhang, H
    Choi, IS
    FUSION ENGINEERING AND DESIGN, 2005, 73 (01) : 35 - 49
  • [35] Final Design and Analysis of Control Strategies on ITER PF Converter
    Fan, Renjing
    Fu, Peng
    Tao, Jun
    Gao, Ge
    Huang, Liansheng
    Song, Zhiquan
    Li, Jinchao
    Ye, Yulong
    FUSION SCIENCE AND TECHNOLOGY, 2020, 76 (01) : 21 - 28
  • [36] The ITER full size plasma source device design
    Sonato, P.
    Agostinetti, P.
    Anaclerio, G.
    Antoni, V.
    Barana, O.
    Bigi, M.
    Boldrin, M.
    Cavenago, M.
    Dal Bello, S.
    Dalla Palma, M.
    Daniele, A.
    D'Arienzo, M.
    De Lorenzi, A.
    Ferro, A.
    Fiorentin, A.
    Gaio, E.
    Gazza, E.
    Grando, L.
    Fantini, F.
    Fellin, F.
    Luchetta, A.
    Manduchi, G.
    Milani, F.
    Marcuzzi, D.
    Novello, L.
    Pasqualotto, R.
    Pavei, M.
    Pengo, R.
    Peruzzo, S.
    Pesce, A.
    Pilan, N.
    Piovan, R.
    Pomaro, N.
    Recchia, M.
    Rigato, W.
    Rizzolo, A.
    Serianni, G.
    Spolaore, M.
    Spolaore, P.
    Sandri, S.
    Taliercio, C.
    Toigo, V.
    Valisa, M.
    Veltri, P.
    Zaccaria, R.
    Zamengo, A.
    Zanotto, L.
    FUSION ENGINEERING AND DESIGN, 2009, 84 (2-6) : 269 - 274
  • [37] A case study of the real-time framework for the implementation of the ITER plasma control system
    Lee, W.
    Tak, T.
    Zagar, A.
    Van Herck, W.
    Gunion, R.
    Ravensbergen, T.
    Zabeo, L.
    de Vries, P. C.
    Pospelov, G.
    FUSION ENGINEERING AND DESIGN, 2023, 193
  • [38] First results from the MAST digital plasma control system
    McArdle, GJ
    Storrs, J
    FUSION ENGINEERING AND DESIGN, 2004, 71 (1-4) : 59 - 64
  • [39] Plasma protection module design for ITER CIS fast architecture
    Tak, Taehyun
    Hong, Jaesic
    Lee, Taegu
    Lee, Woongryul
    Kwon, Giil
    Prieto, I.
    Pedica, R.
    Lee, Gisik
    Cho, Jungyul
    Bang, Geugsin
    FUSION ENGINEERING AND DESIGN, 2017, 124 : 1228 - 1232
  • [40] Plasma neutraliser for ITER NBI
    Kulygin, VM
    Skovoroda, AA
    Zhil'tsov, VA
    PLASMA DEVICES AND OPERATIONS, 1998, 6 (1-3): : 135 - 147