Ganesh: Grid application management and enhanced scheduling

被引:1
作者
Bhatt, H. S. [1 ]
Patel, R. M. [1 ]
Kotecha, H. J. [1 ]
Patel, V. H. [1 ]
Dasgupta, A. [1 ]
机构
[1] Indian Space Res Org, Ctr Space Applicat, SAG SITAA, Ahmadabad 380015, Gujarat, India
关键词
Grid computing; High performance computing; Scheduler; Workflow;
D O I
10.1177/1094342007083777
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Grid computing is emerging as the next generation computing environment. Various meta-computing and distributed computing environments are becoming grid compliant with the aim of achieving interoperability. We have developed a web-based development environment for distributed computing that supports heterogeneous resources and provides ease of use. We present herewith GANESH that achieves grid compliance using Globus and also extends features for added value. This paper describes GANESH architecture and its services, and explains its grid compliance and extended features. We also explain in this paper how and where it is interoperable with other environments.
引用
收藏
页码:419 / 428
页数:10
相关论文
共 50 条
  • [21] A survey on grid task scheduling
    Ma, Tinghuai
    Yan, Qiaoqiao
    Liu, Wenjie
    Mengmeng, Cui
    INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2011, 41 (3-4) : 303 - 309
  • [22] An Enhanced Adaptive Scoring Job Scheduling Algorithm for Minimizing Job Failure in Heterogeneous Grid Network
    Aparnaa, S. K.
    Kousalya, K.
    2014 INTERNATIONAL CONFERENCE ON RECENT TRENDS IN INFORMATION TECHNOLOGY (ICRTIT), 2014,
  • [23] An Adaptive Scheduling Algorithm for Scheduling Tasks in Computational Grid
    Yu, Kun-Ming
    Chen, Cheng-Kwan
    GCC 2008: SEVENTH INTERNATIONAL CONFERENCE ON GRID AND COOPERATIVE COMPUTING, PROCEEDINGS, 2008, : 185 - 189
  • [24] Application of particle swarm optimization algorithm based on classification strategies to grid task scheduling
    Zhong, Shaobo
    Zhongshi, H.E.
    Journal of Software, 2012, 7 (01) : 118 - 124
  • [25] Cost-based scheduling algorithm for workflow-based application in optical grid
    Zhang, Lingzhi
    Guo, Wei
    Jin, Yaohui
    Sun, Weiqiang
    Hu, Weisheng
    NETWORK ARCHITECTURES, MANAGEMENT, AND APPLICATIONS IX, 2011, 8310
  • [26] A system-centric scheduling policy for optimizing objectives of application and resource in grid computing
    Li Chunlin
    Li Layuan
    COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 57 (03) : 1052 - 1061
  • [27] System Management for Grid-Enabling a Vibroacoustic Analysis Application
    Bentow, Brian
    Dodge, Jon
    Homer, Aaron
    Moore, Christopher D.
    Keller, Robert M.
    Presley, Matthew
    Davis, Robert
    Seidel, Jorge
    Lee, Craig
    Betser, Joseph
    2006 IEEE/IFIP NETWORK OPERATIONS AND MANAGEMENT SYMPOSIUM, VOLS 1 AND 2, 2006, : 812 - +
  • [28] Contribution of BFO in Grid Scheduling
    Raj, Joshua Samuel
    Priya, Devi S.
    2012 IEEE INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND COMPUTING RESEARCH (ICCIC), 2012, : 131 - 134
  • [29] Cost-based scheduling algorithm for workflow-based application in optical grid
    Zhang, Lingzhi
    Guo, Wei
    Jin, Yaohui
    Sun, Weiqiang
    Hu, Weisheng
    2011 ASIA COMMUNICATIONS AND PHOTONICS CONFERENCE AND EXHIBITION (ACP), 2012,
  • [30] Grid job scheduling using Route with Genetic Algorithm support
    Rodrigo F. de Mello
    José A. Andrade Filho
    Luciano J. Senger
    Laurence T. Yang
    Telecommunication Systems, 2008, 38 : 147 - 160