Operating reserve model in the power market

被引:110
作者
Wang, JX [1 ]
Wang, XF
Wu, Y
机构
[1] Xian Jiaotong Univ, Xian 710049, Shaanxi, Peoples R China
[2] Texas A&M Univ, College Stn, TX 77843 USA
基金
中国国家自然科学基金;
关键词
cost-benefit analysis; operating reserve capacity; power market; reliability;
D O I
10.1109/TPWRS.2004.841232
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Most of the current research on operating reserve markets assumes that the required capacity is predetermined, which means that the demand of operating reserve capacity is inelastic. This paper considers that operating reserve capacity in a power system is flexible and that one should optimize it by cost-benefit analysis. Based on the reliability evaluation of the generation system, a clearing model of the operating reserve market is proposed to determine the optimal reserve capacity and simultaneously clear the operating reserve market. The model is discussed on both uniform-price and pay-as-bid auction mechanisms. By using a heuristic method, we suggest an efficient algorithm to solve the model. Case studies for reliability test system (RTS96) demonstrate the usefulness and efficiency of the proposed model.
引用
收藏
页码:223 / 229
页数:7
相关论文
共 12 条
[1]  
[Anonymous], 1989, J CHEMOM, DOI DOI 10.1002/CEM.1180030104
[2]   Optimal response of a power generator to energy, AGC, and reserve pool-based markets [J].
Arroyo, JM ;
Conejo, AJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2002, 17 (02) :404-410
[3]  
Fabra N, 2002, Electr J, V15, P72
[4]   Optimal scheduling of spinning reserve - Reply [J].
Gooi, HB ;
Mendes, DP ;
Bell, KRW ;
Kirschen, DS .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (04) :1492-1492
[5]   The IEEE reliability test system - 1996 [J].
Grigg, C ;
Wong, P ;
Albrecht, P ;
Allan, R ;
Bhavaraju, M ;
Billinton, R ;
Chen, Q ;
Fong, C ;
Haddad, S ;
Kuruganty, S ;
Li, W ;
Mukerji, R ;
Patton, D ;
Rau, N ;
Reppen, D ;
Schneider, A ;
Shahidehpour, M ;
Singh, C .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (03) :1010-1018
[6]  
Kahn Alfred E, 2001, The electricity journal, V14, P70, DOI [10.1016/S1040-6190(01)00216-0, DOI 10.1016/S1040-6190(01)00216-0]
[7]   Factors affecting customer outage costs due to electric service interruptions [J].
Kariuki, KK ;
Allan, RN .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 1996, 143 (06) :521-528
[8]   Market power and price volatility in restructured markets for electricity [J].
Mount, T .
DECISION SUPPORT SYSTEMS, 2001, 30 (03) :311-325
[9]   Price-based adaptive spinning reserve requirements in power system scheduling [J].
Tseng, CL ;
Oren, SS ;
Svoboda, AJ ;
Johnson, RB .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1999, 21 (02) :137-145
[10]  
Vazquez C., 2001, The Electricity Journal, V4, P41, DOI DOI 10.1016/51040-6190(01)00196-8