Simulations of the Asian summer monsoon in the sub-seasonal to seasonal prediction project (S2S) database

被引:86
作者
Jie, Weihua [1 ]
Vitart, Frederic [2 ]
Wu, Tongwen [1 ]
Liu, Xiangwen [1 ]
机构
[1] China Meteorol Adm, Beijing Climate Ctr, Beijing, Peoples R China
[2] ECMWF, Reading, Berks, England
基金
中国国家自然科学基金;
关键词
sub-seasonal to seasonal prediction; BSISO; Asian monsoon; MJO; predictability; INTERANNUAL VARIABILITY; INTRASEASONAL OSCILLATIONS; PRECIPITATION; SYSTEM; PREDICTABILITY; FORECAST; INDEXES; MODELS; REGION;
D O I
10.1002/qj.3085
中图分类号
P4 [大气科学(气象学)];
学科分类号
0706 ; 070601 ;
摘要
Several monsoon indices have been applied to multiple models from the sub-seasonal to seasonal (S2S) prediction project database during the period May to October 1999-2010 to assess their ability to simulate the Asian monsoon. The bivariate anomaly correlation (BAC) of the Boreal Summer IntraSeasonal Oscillation (BSISO) index suggests that the operational models can predict the BSISO1 and BSISO2 events up to 6-24.5 and 6.5-14 days in advance respectively, although the models tend to underestimate the amplitude of BSISO as the lead time increases. For the strong BSISO events, BSISO1 (BSISO2) display lower skill mostly in phases 3-5 for all the models, suggesting that the BSISO1 (BSISO2) is not easy to predict when it is located over India and the Maritime Continent (South China Sea and Bay of Bengal). On the other hand, the higher skills appear in different phases for different models. For instance, the limit of predictive skill of strong BSISO1 and BSISO2 events in phases 6-7 for the ECMWF ensemble forecast could exceed 30 and 28 days, respectively. The comparisons of the BSISO life cycle among the ECMWF, NCEP and CMA models also indicate that the ECMWF model can better predict the evolution of strong BSISO events. Predictions of additional monsoon circulation indices including the Webster-Yang index (WY), Indian Summer Monsoon index (ISM), South Asian Monsoon index (SAM), and SouthEast Asian Monsoon index (SEAM) in the S2S models have statistically significant skill over the corresponding monsoon regions up to 9-31, 3-17, 7-13 and 7-14 days, respectively. However, the significant skill of summer monsoon precipitation over the SAM and SEAM regions varies significantly among the models, with the skill ranging from 2 days to 2 weeks lead time.
引用
收藏
页码:2282 / 2295
页数:14
相关论文
共 37 条
  • [1] Prediction and monitoring of monsoon intraseasonal oscillations over Indian monsoon region in an ensemble prediction system using CFSv2
    Abhilash, S.
    Sahai, A. K.
    Borah, N.
    Chattopadhyay, R.
    Joseph, S.
    Sharmila, S.
    De, S.
    Goswami, B. N.
    Kumar, Arun
    [J]. CLIMATE DYNAMICS, 2014, 42 (9-10) : 2801 - 2815
  • [2] The ERA-Interim reanalysis: configuration and performance of the data assimilation system
    Dee, D. P.
    Uppala, S. M.
    Simmons, A. J.
    Berrisford, P.
    Poli, P.
    Kobayashi, S.
    Andrae, U.
    Balmaseda, M. A.
    Balsamo, G.
    Bauer, P.
    Bechtold, P.
    Beljaars, A. C. M.
    van de Berg, L.
    Bidlot, J.
    Bormann, N.
    Delsol, C.
    Dragani, R.
    Fuentes, M.
    Geer, A. J.
    Haimberger, L.
    Healy, S. B.
    Hersbach, H.
    Holm, E. V.
    Isaksen, L.
    Kallberg, P.
    Koehler, M.
    Matricardi, M.
    McNally, A. P.
    Monge-Sanz, B. M.
    Morcrette, J. -J.
    Park, B. -K.
    Peubey, C.
    de Rosnay, P.
    Tavolato, C.
    Thepaut, J. -N.
    Vitart, F.
    [J]. QUARTERLY JOURNAL OF THE ROYAL METEOROLOGICAL SOCIETY, 2011, 137 (656) : 553 - 597
  • [3] Impact of atmosphere-ocean coupling on the predictability of monsoon intraseasonal oscillations
    Fu, Xiouhua
    Wang, Bin
    Waliser, Duane E.
    Tao, Li
    [J]. JOURNAL OF THE ATMOSPHERIC SCIENCES, 2007, 64 (01) : 157 - 174
  • [4] Intraseasonal Forecasting of the Asian Summer Monsoon in Four Operational and Research Models
    Fu, Xiouhua
    Lee, June-Yi
    Wang, Bin
    Wang, Wanqiu
    Vitart, Frederic
    [J]. JOURNAL OF CLIMATE, 2013, 26 (12) : 4186 - 4203
  • [5] Impacts of initial conditions on monsoon intraseasonal forecasting
    Fu, Xiouhua
    Wang, Bin
    Bao, Qing
    Liu, Ping
    Lee, June-Yi
    [J]. GEOPHYSICAL RESEARCH LETTERS, 2009, 36
  • [6] Goswami BN, 1999, Q J ROY METEOR SOC, V125, P611, DOI 10.1002/qj.49712555412
  • [7] Huffman GJ, 2001, J HYDROMETEOROL, V2, P36, DOI 10.1175/1525-7541(2001)002<0036:GPAODD>2.0.CO
  • [8] 2
  • [9] Seasonal-to-Interannual Prediction of the Asian Summer Monsoon in the NCEP Climate Forecast System Version 2
    Jiang, Xingwen
    Yang, Song
    Li, Yueqing
    Kumar, Arun
    Liu, Xiangwen
    Zuo, Zhiyan
    Jha, Bhaskar
    [J]. JOURNAL OF CLIMATE, 2013, 26 (11) : 3708 - 3727
  • [10] Using a deterministic time-lagged ensemble forecast with a probabilistic threshold for improving 6-15 day summer precipitation prediction in China
    Jie, Weihua
    Wu, Tongwen
    Wang, Jun
    Li, Weijing
    Polivka, Thomas
    [J]. ATMOSPHERIC RESEARCH, 2015, 156 : 142 - 159