Assessment of Deburring Costs in Industrial Case Studies

被引:3
|
作者
Arrazola, P. J. [1 ]
机构
[1] Mondragon Univ, Mfg Dept, Fac Engn, Arrasate Mondragon 20500, Spain
来源
BURRS - ANALYSIS, CONTROL AND REMOVAL: PROCEEDINGS OF THE CIRP INTERNATIONAL CONFERENCE ON BURRS, 2009 | 2010年
关键词
Burr removal; Deburring; Cost;
D O I
10.1007/978-3-642-00568-8_27
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Owing to the fact that deburring is considered a non-added value operation, little attention is paid to estimating its real cost. However, deburring expenses in manufacturing processes can be significant depending on the workpiece or sector considered. They can vary from 2 to 3% for mass production of relatively common parts in automotive sector to 9-10% in the case of aeronautics for small batches series or mass production of complicated parts. This figure can reach even higher values in other sectors such as medicine. Seven case studies from different manufacturing sectors (aeronautics, automotive, heavy transport, oil piping transport...) will be outlined in this paper in an attempt to assess real deburring costs and other issues dealing with the reasons why deburring is carried out and the methods used for burr removal.
引用
收藏
页码:245 / 251
页数:7
相关论文
共 50 条
  • [1] Deburring of cross holes in titanium using industrial robots
    Pischan, Matthias
    WGP CONGRESS 2013: PROGRESS IN PRODUCTION ENGINEERING, 2013, 769 : 147 - 154
  • [2] Studies on Robotic Deburring of Machined Components using a SCARA Robot
    Subhashini, P. V. S.
    Raju, N. V. S.
    Rao, G. Venkata
    2015 INTERNATIONAL CONFERENCE ON ROBOTICS, AUTOMATION, CONTROL AND EMBEDDED SYSTEMS (RACE), 2015,
  • [3] Research On Technology Of Fluid-Impact Fatigue Fracture Deburring Based On Industrial Robot
    Hu, Haiyan
    Su, Chang
    Zhou, Jinming
    2019 11TH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION (ICMTMA 2019), 2019, : 381 - 384
  • [4] ASSESSMENT OF COSTS OF PUBLIC WORKS
    Ellingerova, H.
    SLOVAK JOURNAL OF CIVIL ENGINEERING, 2013, 21 (04) : 51 - 60
  • [5] Analysis of Water Safety Plan costs from case studies in the Western Pacific Region
    Chang, Zai Kang
    Chong, Mien Ling
    Bartram, Jamie
    WATER SCIENCE AND TECHNOLOGY-WATER SUPPLY, 2013, 13 (05): : 1358 - 1366
  • [6] On the issue of costs in programmatic assessment
    van der Vleuten, Cees P. M.
    Heeneman, Sylvia
    PERSPECTIVES ON MEDICAL EDUCATION, 2016, 5 (05) : 303 - 307
  • [7] Deep Reinforcement Learning with Inverse Jacobian based Model-Free Path Planning for Deburring in Complex Industrial Environment
    M. R. Rahul
    Shital S. Chiddarwar
    Journal of Intelligent & Robotic Systems, 2024, 110
  • [8] Deep Reinforcement Learning with Inverse Jacobian based Model-Free Path Planning for Deburring in Complex Industrial Environment
    Rahul, M. R.
    Chiddarwar, Shital S.
    JOURNAL OF INTELLIGENT & ROBOTIC SYSTEMS, 2024, 110 (01)
  • [9] Manufacturing Economics of Plant-Made Biologics: Case Studies in Therapeutic and Industrial Enzymesy
    Tuse, Daniel
    Tu, Tiffany
    McDonald, Karen A.
    BIOMED RESEARCH INTERNATIONAL, 2014, 2014
  • [10] An assessment of CCS costs, barriers and potential
    Budinis, Sara
    Krevor, Samuel
    Mac Dowell, Niall
    Brandon, Nigel
    Hawkes, Adam
    ENERGY STRATEGY REVIEWS, 2018, 22 : 61 - 81