An Overview of Risk-Based Inspection Planning for Flexible Pipeline

被引:0
作者
Hameed, Hamad [1 ]
Sun, Guowei [1 ]
Bai, Yong [1 ]
机构
[1] Zhejiang Univ, Hangzhou, Zhejiang, Peoples R China
来源
PROCEEDINGS OF THE ASME 37TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2018, VOL 5 | 2018年
关键词
Flexible Pipes; Risk-Based Inspection (RBI); Integrity Management; Failure modes; Risk assessment; Inspection Strategy;
D O I
暂无
中图分类号
P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
There are many failure mechanisms that may occur in flexible pipes during their service life, such as external sheath damage, damage of tensile armours due to fatigue, kinks due to corrosion, and over-bending. The above mentioned defects are very common and can lead to the failure of flexible pipes. Therefore, huge operational costs have to be spent to ensure the integrity of the flexible pipeline system. Risk-Based inspection (RBI) methodology can establish a cost-effective strategy for inspection and monitoring, while maintaining the expected level of safety. However, there are some factors that can hamper the development of an optimized RBI for the integrity management of flexible pipelines, such as the complexity and variety of flexible pipes' multi-layer structures with their interacting failure mechanisms, the somewhat poor defect capability of the existing inspection techniques and the lack of broad [1]. In this paper, RBI planning is described thoroughly to ensure the integrity management of flexible pipelines. All risk terms have been described in detail with respect to integrity management strategy. The working process of RBI, including initial assessment and detailed assessment, is introduced. Estimation and evaluation of risk level, including the development of optimized inspection planning, have been described completely.
引用
收藏
页数:14
相关论文
共 18 条
[1]  
[Anonymous], 2009, DNVGLRPG101
[2]  
[Anonymous], 2010, DNV-RP-F101
[3]  
API, 2009, APIRP580
[4]  
Bai Qiang, 2014, Subsea Pipeline Design, Analysis, and Installation, P559
[5]  
Bai Y, 2005, ELSEV OCEAN ENG SER, P1
[6]  
Bjornoy O. H., 2001, P OFFSH MECH ARCT EN
[7]  
BjOrnOy O. H., 2001, 11 INT OFFSH POL ENG
[8]  
Director Arthur D., 1993, I CHEM ENG S SERIES, V130
[9]  
DNV, 2007, DNV-OS-F101
[10]  
Douillard Bertrand, 2014, EXPT ROBOTICS