Determining the bounds of skilful forecast range for probabilistic prediction of system-wide wind power generation

被引:11
作者
Cannon, Dirk [1 ]
Brayshaw, David [1 ,2 ]
Methven, John [1 ]
Drew, Daniel [1 ]
机构
[1] Univ Reading, Dept Meteorol, Reading, Berks, England
[2] Univ Reading, Natl Ctr Atmospher Sci, Reading, Berks, England
关键词
Wind Power Forecasting; Global NWP; Ensemble Forecasting; Predictability; Ramping; Skill Scores; ENSEMBLE PREDICTION; GREAT-BRITAIN; REAL;
D O I
10.1127/metz/2016/0751
中图分类号
P4 [大气科学(气象学)];
学科分类号
0706 ; 070601 ;
摘要
State-of-the-art wind power forecasts beyond a few hours ahead rely on global numerical weather prediction models to forecast the future large-scale atmospheric state. Often they provide initial and boundary conditions for nested high resolution simulations. In this paper, both upper and lower bounds on forecast range are identified within which global ensemble forecasts provide skilful information for system-wide wind power applications. An upper bound on forecast range is associated with the limit of predictability, beyond which forecasts have no more skill than predictions based on climatological statistics. A lower bound is defined at the lead time beyond which the resolved uncertainty associated with estimating the future large-scale atmospheric state is larger than the unresolved uncertainty associated with estimating the system-wide wind power response to a given large-scale state. The bounds of skilful ensemble forecast range are quantified for three leading global forecast systems. The power system of Great Britain (GB) is used as an example because independent verifying data is available from National Grid. The upper bound defined by forecasts of GB-total wind power generation at a specific point in time is found to be 6-8 days. The lower bound is found to be 1.4-2.4 days. Both bounds depend on the global forecast system and vary seasonally. In addition, forecasts of the probability of an extreme power ramp event were found to possess a shorter limit of predictability (4.5-5.5 days). The upper bound on this forecast range can only be extended by improving the global forecast system (outside the control of most users) or by changing the metric used in the probability forecast. Improved downscaling and microscale modelling of the wind farm response may act to decrease the lower bound. The potential gain from such improvements have diminishing returns beyond the short-range (out to around 2 days).
引用
收藏
页码:239 / 252
页数:14
相关论文
共 36 条
  • [21] Hersbach H, 2000, WEATHER FORECAST, V15, P559, DOI 10.1175/1520-0434(2000)015<0559:DOTCRP>2.0.CO
  • [22] 2
  • [23] Surface Wind Regionalization over Complex Terrain: Evaluation and Analysis of a High-Resolution WRF Simulation
    Jimenez, Pedro A.
    Fidel Gonzalez-Rouco, J.
    Garcia-Bustamante, Elena
    Navarro, Jorge
    Montavez, Juan P.
    Vila-Guerau de Arellano, Jordi
    Dudhia, Jimy
    Munoz-Roldan, Antonio
    [J]. JOURNAL OF APPLIED METEOROLOGY AND CLIMATOLOGY, 2010, 49 (02) : 268 - 287
  • [24] Medium-range multimodel ensemble combination and calibration
    Johnson, Christine
    Swinbank, Richard
    [J]. QUARTERLY JOURNAL OF THE ROYAL METEOROLOGICAL SOCIETY, 2009, 135 (640) : 777 - 794
  • [25] Lorenz E. N., 1975, WMO GARP PUBLICATION, V16, P132
  • [26] LORENZ EN, 1963, J ATMOS SCI, V20, P130, DOI 10.1175/1520-0469(1963)020<0130:DNF>2.0.CO
  • [27] 2
  • [28] Verification of European Subseasonal Wind Speed Forecasts
    Lynch, Kieran J.
    Brayshaw, David J.
    Charlton-Perez, Andrew
    [J]. MONTHLY WEATHER REVIEW, 2014, 142 (08) : 2978 - 2990
  • [29] Mass CF, 2002, B AM METEOROL SOC, V83, P407, DOI 10.1175/1520-0477(2002)083<0407:DIHRPM>2.3.CO
  • [30] 2