Perspectives on model based integration of process operations

被引:47
作者
Bassett, MH [1 ]
Dave, P [1 ]
Doyle, FJ [1 ]
Kudva, GK [1 ]
Pekny, JF [1 ]
Reklaitis, GV [1 ]
Subrahmanyam, S [1 ]
Miller, DL [1 ]
Zentner, MG [1 ]
机构
[1] ADV PROC COMBINAT, W LAFAYETTE, IN 47906 USA
关键词
D O I
10.1016/0098-1354(95)00184-0
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The chemical process industry has increasingly been pursuing the use of computing technology to gather, organize, disseminate and exploit enterprise information and to closely coordinate the decisions made at the various levels of the process operational hierarchy so as to optimize overall corporate objectives. The thesis advanced in this paper is that mathematical programming models and solution methods offer the most effective tools for integration of the tactical and strategic levels of the operational hierarchy. To that end, existing strategies for implementing model-based integrated applications are reviewed. Four classes of examples of integration are presented: scheduling of multiproduct plants, large-scale model predictive control, integration of planning and scheduling across single and multiple plant sites and design of multipurpose batch plants under uncertainty. The methodology used to address these model-based integration instances successfully accommodates the key features of process operations: diverse time scale, multiple reference frameworks, spatial and organizational aggregation/disaggregation and uncertainty in the enterprise information. The applications further demonstrate that for the foreseeable future no single model or reference framework will be sufficient and efficient for treating all aspects of the process operations hierarchy.
引用
收藏
页码:821 / 844
页数:24
相关论文
共 30 条
  • [11] KONDILI E, 1988, P 3 INT S PROC SYST, P62
  • [12] Kudva G. K., 1993, Annals of Operations Research, V42, P25, DOI 10.1007/BF02023171
  • [13] MACCHIETTO S, 1993, F COMPUTER AIDED PRO
  • [14] MOHINDRA AK, 1994, THESIS PURDUE U W LA
  • [15] PANTELIDES CC, 1993, F COMPUTER AIDED PRO
  • [16] Pekny J. F., 1994, ORSA Journal on Computing, V6, P68, DOI 10.1287/ijoc.6.1.68
  • [17] EXACT SOLUTION OF THE NO-WAIT FLOWSHOP SCHEDULING PROBLEM WITH A COMPARISON TO HEURISTIC METHODS
    PEKNY, JF
    MILLER, DL
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 1991, 15 (11) : 741 - 748
  • [18] PEKNY JF, 1993, F COMPUTER AIDED PRO
  • [19] RAWLINGS JB, 1994, P AM CONTR C SAN FRA, P379
  • [20] ROTSTEIN GE, 1993, COMPUTERS CHEM ENG S, V18, pS499