Integrated techno-economic modeling, flexibility analysis, and business case assessment of an urban virtual power plant with multi-market co-optimization

被引:93
|
作者
Wang, Han [1 ]
Riaz, Shariq [1 ]
Mancarella, Pierluigi [1 ,2 ]
机构
[1] Univ Melbourne, Dept Elect & Elect Engn, Bldg 193, Parkville, Vic 3010, Australia
[2] Univ Manchester, Dept Elect & Elect Engn, Ferranti Bldg, Manchester M13 9PL, Lancs, England
基金
英国工程与自然科学研究理事会;
关键词
Virtual power plant; Multi-market participation; Flexibility; Techno-economic analysis; Co-optimization; Frequency control ancillary services; BIDDING STRATEGY; DEMAND RESPONSE; ENERGY;
D O I
10.1016/j.apenergy.2019.114142
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The concept of Virtual Power Plant (VPP) is recognized as an effective option to aggregate and operate Distributed Energy Resources (DER) to participate in wholesale energy markets and provide flexibility and associated grid services that are needed in a renewable-rich energy system. Also, as most of the DER are available in urban areas, there are increasing interests in assessing the potential to develop urban VPP, for example in university campuses. However, exploiting the flexibility of VPP and developing robust business cases require advanced considerations on their technical and commercial constraints and trade-offs in deploying the VPP's flexibility when simultaneously participating in multiple markets. In this context, this paper presents a comprehensive, integrated techno-economic modeling approach that assesses the technical and commercial flexibility opportunities and develops a relevant business case framework based on co-optimized participation in multiple markets for an urban VPP. A real-world case study based on the University of Melbourne's new campus under development is used to demonstrate the proposed approach, including the VPP's participation in the energy, frequency control ancillary services, demand response, and hedging contract markets. The technical analysis shows that diversity of DER portfolio results in improved participation of VPP in various markets. From an economic perspective, a multi-market co-optimization model such as the one proposed here, fully exploiting the DER's aggregated flexibility, results in attractive business cases for operating DER in urban areas as a VPP. The proposed approach and examples provided may be seen as a blueprint for more VPP applications and unlocking the great flexibility available in urban areas.
引用
收藏
页数:17
相关论文
共 10 条
  • [1] Techno-economic and business case assessment of multi-energy microgrids with co-optimization of energy, reserve and reliability services
    Cesena, Eduardo A. Martinez
    Good, Nicholas
    Syrri, Angeliki L. A.
    Mancarella, Pierluigi
    APPLIED ENERGY, 2018, 210 : 896 - 913
  • [2] Techno-economic analysis of solar grid-based virtual power plant in Indian power sector: A case study
    Sharma, Harpreet
    Mishra, Sachin
    INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2020, 30 (01):
  • [3] Techno-economic, environmental and emergy analysis and optimization of integrated solar parabolic trough collector and multi effect distillation systems with a combined cycle power plant
    Manesh, Mohammad Hasan Khoshgoftar
    Aghdam, Meysam Hajizadeh
    Modabber, Hossein Vazini
    Ghasemi, Amir
    Talkhoncheh, Mahdi Khajeh
    ENERGY, 2022, 240
  • [4] Techno-economic analysis of a CO2 capture plant integrated with a commercial scale combined cycle gas turbine (CCGT) power plant
    Canepa, Roberto
    Wang, Meihong
    APPLIED THERMAL ENGINEERING, 2015, 74 : 10 - 19
  • [5] Improved marketing strategy of a hybrid renewable plant integrated with gravitational energy storage: Techno-economic analysis and multi-objective optimization
    Roushenas, Ramin
    Rahbari, Hamid Reza
    Alsagri, Ali Sulaiman
    Arabkoohsar, Ahmad
    JOURNAL OF ENERGY STORAGE, 2024, 78
  • [6] Design, modeling and multi-objective techno-economic optimization of an integrated supercritical Brayton cycle with solar power tower for efficient hydrogen production
    Hai, Tao
    Dhahad, Hayder A.
    Attia, El-Awady
    Zakaria, Zahriladha
    Rashidi, Shima
    Singh, Pradeep Kumar
    Shamseldin, Mohamed A.
    Almojil, Sattam Fahad
    Almohana, Abdulaziz Ibrahim
    Alali, Abdulrhman Fahmi
    Farhang, Babak
    Cao, Yan
    SUSTAINABLE ENERGY TECHNOLOGIES AND ASSESSMENTS, 2022, 53
  • [7] Techno-economic evaluation and multi-criteria optimization of a trigeneration flash-binary geothermal power plant integrated with parabolic trough solar collectors
    Sharifi, Ali
    Eskandari, Amin
    JOURNAL OF THERMAL ANALYSIS AND CALORIMETRY, 2023, 148 (16) : 8263 - 8282
  • [8] Techno-economic analysis and environmental impact assessment of 3 MW photovoltaic power plant in Bangladesh: a case study based on real data
    M. A. Karim Miah
    Nuruzzaman Rakib
    M. Ahsan Habib
    M. Hasanuzzaman
    Sujoy Saha
    Environment, Development and Sustainability, 2023, 25 : 15205 - 15223
  • [9] Techno-economic analysis and environmental impact assessment of 3 MW photovoltaic power plant in Bangladesh: a case study based on real data
    Miah, M. A. Karim
    Rakib, Nuruzzaman
    Habib, M. Ahsan
    Hasanuzzaman, M.
    Saha, Sujoy
    ENVIRONMENT DEVELOPMENT AND SUSTAINABILITY, 2023, 25 (12) : 15205 - 15223
  • [10] Techno-economic case study of applying heat recovery and CO2 capture systems on a gas turbine power plant; 4E analysis
    Tian, Man-Wen
    Abed, Azher M.
    Chauhan, Bhupendra Singh
    Alsenani, Theyab R.
    Almujibah, Hamad
    Aouaini, Fatma
    Alkhalaf, Salem
    Deifalla, Ahmed
    CASE STUDIES IN THERMAL ENGINEERING, 2023, 49