An analysis of the integrated lot-sizing and cutting-stock problem formulation

被引:7
作者
Pierini, Livia Maria [1 ]
Poldi, Kelly Cristina [1 ]
机构
[1] Univ Estadual Campinas, Inst Matemat Estat & Comp Cient IMECC, UNICAMP, R Sergio Buarque de Holanda 651, BR-13083859 Campinas, SP, Brazil
基金
巴西圣保罗研究基金会;
关键词
Lot-sizing problem; Cutting-stock problem; Column generation; Relax-and-fix heuristic;
D O I
10.1016/j.apm.2021.06.009
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The integrated lot-sizing and cutting-stock problem has become a trend in the last decades for its applicability and advantage. Consequently, different approaches and formulations have been developed. One of them, which is widespread and related to the production and cutting process of paper, is the research subject of this paper. Fundamental considerations about the literature model are discussed and an alternative formulation is proposed, which consists of a simplified version that can provide better solutions. The upgrade modifications are proved analytically and an instance is analyzed to exemplify the discussed improvement. Moreover, computational tests are performed to compare both formulations. The novelty of the proposed formulation is the possibility of finding better solutions through the reduction of a constraint set, which guarantees the flexibility given by item and object inventories in meeting demand and it also enables a reduction in the total amount of produced paper. The proposed formulation has a significant impact on future research since the addressed model is the target of many scientific researches and practical applications. (c) 2021 Elsevier Inc. All rights reserved.
引用
收藏
页码:155 / 165
页数:11
相关论文
共 32 条
[1]   Risk-averse two-stage stochastic programs in furniture plants [J].
Alem, Douglas ;
Morabito, Reinaldo .
OR SPECTRUM, 2013, 35 (04) :773-806
[2]   COMPUTATIONAL-COMPLEXITY OF THE CAPACITATED LOT SIZE PROBLEM [J].
BITRAN, GR ;
YANASSE, HH .
MANAGEMENT SCIENCE, 1982, 28 (10) :1174-1186
[3]   A multiobjective integrated model for lot sizing and cutting stock problems [J].
Campello, B. S. C. ;
Ghidini, C. T. L. S. ;
Ayres, A. O. C. ;
Oliveira, W. A. .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2020, 71 (09) :1466-1478
[4]  
Captivo M., 2002, INTEGRATING CUTTING
[5]   Simultaneous lotsizing and scheduling problems: a classification and review of models [J].
Copil, Karina ;
Woerbelauer, Martin ;
Meyr, Herbert ;
Tempelmeier, Horst .
OR SPECTRUM, 2017, 39 (01) :1-64
[6]   Reel and sheet cutting at a paper mill [J].
Correia, MH ;
Oliveira, JF ;
Ferreira, JS .
COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (08) :1223-1243
[7]   Bin packing and cutting stock problems: Mathematical models and exact algorithms [J].
Delorme, Maxence ;
Iori, Manuel ;
Martello, Silvano .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 255 (01) :1-20
[8]   Valid inequalities for two-period relaxations of big-bucket lot-sizing problems: Zero setup case [J].
Doostmohammadi, Mahdi ;
Akartunali, Kerem .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 267 (01) :86-95
[10]   A SUGGESTED COMPUTATION FOR MAXIMAL MULTICOMMODITY NETWORK FLOWS [J].
FORD, LR ;
FULKERSON, DR .
MANAGEMENT SCIENCE, 1958, 5 (01) :97-101