A stakeholder probability-based optimization approach for cost-effective bridge management under financial constraints

被引:17
|
作者
Orcesi, Andre D. [1 ]
Frangopol, Dan M. [2 ]
机构
[1] IFSTTAR, Bridges & Struct Dept, F-75732 Paris 15, France
[2] Lehigh Univ, Dept Civil & Environm Engn, ATLSS Engn Res Ctr, Bethlehem, PA 18015 USA
基金
美国国家科学基金会;
关键词
Structural health monitoring; Maintenance; Cost; Uncertainty; Multiple criteria optimization; Bridge management; ORIENTED MULTIOBJECTIVE OPTIMIZATION; LIFE-CYCLE COST; PERFORMANCE PREDICTION; DETERIORATING BRIDGES; HIGHWAY BRIDGES; MAINTENANCE; RELIABILITY;
D O I
10.1016/j.engstruct.2010.12.035
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Management of bridges under uncertainty is an important issue for stakeholders. The use of probabilistic approaches enables one to consider uncertainties in the structural deterioration, assessment, and maintenance processes. Combined with optimization techniques, it is possible to determine management strategies that simultaneously minimize failure, assessment, maintenance, and rehabilitation costs. Nevertheless, there is a strong need in developing practical and efficient frameworks that enable stakeholders to optimize future allocation of budgets for facilities under uncertain structural parameters. In particular, providing an approach that is in agreement with stakeholders constraints still remains a challenge. Moreover, the use of structural health monitoring (SHM) in future management frameworks, to update structural performance, still needs further development. The objective of this paper is threefold: (a) provide management strategies in agreement with fixed budgets, (b) provide management strategies that consider the time delay between the assessment and the intervention schedule, and (c) include information provided by SHM in the decision process and analyze the impact of monitoring strategies on the structural analysis accuracy. An event tree based approach is proposed to consider various uncertainties in the decision process. Optimal solutions are associated with multiple criteria such as minimum expected failure cost, minimum expected inspection/SHM/maintenance costs, maximum agreement of expected inspection/SHM/maintenance costs to available budgets, and maximum accuracy of monitoring results. The approach is illustrated on an existing highway bridge. (C) 2011 Elsevier Ltd. All rights reserved,
引用
收藏
页码:1439 / 1449
页数:11
相关论文
共 50 条
  • [41] Economic issues: Toward a cost-effective approach to the management of febrile neutropenia in Japan
    Masaoka, T
    CLINICAL INFECTIOUS DISEASES, 2004, 39 : S68 - S69
  • [42] Immunoadsorption may provide a cost-effective approach to management of patients with inhibitors to FVIII
    Freedman, J
    Rand, ML
    Russell, O
    Davis, C
    Cheatley, PL
    Blanchette, V
    Garvey, MB
    TRANSFUSION, 2003, 43 (11) : 1508 - 1513
  • [43] Cost-effective approach to liquid/solid separation Part #1 - Water management
    Fogarty, TJ
    Marks, J
    Toomey, W
    PULPING CONFERENCE, VOLS 1-3, 1998, : 1239 - 1252
  • [44] DESIGN OF A MEDICAL IMAGE MANAGEMENT-SYSTEM - A PRACTICAL COST-EFFECTIVE APPROACH
    SESHADRI, SB
    ARENSON, RL
    VANDERVOORDE, F
    KHALSA, S
    KUNDEL, HL
    BRIKMAN, I
    COMPUTER METHODS AND PROGRAMS IN BIOMEDICINE, 1987, 25 (02) : 185 - 192
  • [45] A Game Theoretic Approach for Cost-Effective Management of Energy Harvesting Smart Grids
    Blinovas, Artiom
    Urazaki, Kenji Junior
    Badia, Leonardo
    Gindullina, Elvina
    2022 INTERNATIONAL WIRELESS COMMUNICATIONS AND MOBILE COMPUTING, IWCMC, 2022, : 18 - 23
  • [46] Assessing embodied carbon and financial implications in concrete T-girder bridge design for cost-effective sustainability
    Suwondo, Riza
    Keintjem, Militia
    Suangga, Made
    Cunningham, Lee
    INNOVATIVE INFRASTRUCTURE SOLUTIONS, 2024, 9 (05)
  • [47] Assessing embodied carbon and financial implications in concrete T-girder bridge design for cost-effective sustainability
    Riza Suwondo
    Militia Keintjem
    Made Suangga
    Lee Cunningham
    Innovative Infrastructure Solutions, 2024, 9
  • [48] Practical guidelines for the management of osteoporosis evidence-based and cost-effective
    Bartl, R.
    DEUTSCHE MEDIZINISCHE WOCHENSCHRIFT, 2007, 132 (18) : 995 - 999
  • [49] Cost-effective Energy Management System in Prosumer based Electricity Market
    Ahmed, Syed Adrees
    Huang, Qi
    Amin, Waqas
    Afzal, Muhammad
    2020 INTERNATIONAL CONFERENCE ON SMART GRIDS AND ENERGY SYSTEMS (SGES 2020), 2020, : 181 - 185
  • [50] Heuristic-based optimisation approach: cost-effective school transportation
    Dragan, Dejan
    Keshavarzsaleh, Abolfazl
    Popovic, Vlado
    Jereb, Borut
    Intihar, Marko
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-TRANSPORT, 2022, 175 (04) : 220 - 237