In-lake measures for phosphorus control: The most feasible and cost-effective solution for long-term management of water quality in urban lakes

被引:123
作者
Huser, Brian J. [1 ]
Futter, Martyn [1 ]
Lee, Jeff T. [2 ]
Perniel, Mike [3 ]
机构
[1] Swedish Univ Agr Sci, Dept Aquat Sci & Assessment, Box 7050, S-75007 Uppsala, Sweden
[2] Barr Engn Co, 325 South Lake Ave,Suite 700, Duluth, MN USA
[3] Minneapolis Pk & Recreat Board, 3800 Bryant Ave South, Minneapolis, MN USA
关键词
Aluminum sulfate; Sediment; Lake restoration; Best management practices; Alum; PHOSPHATE ADSORPTION; ALUMINUM ADDITION; PARTICULATE; SEDIMENT; FRESH; RESTORATION; RELEASE; MODEL;
D O I
10.1016/j.watres.2015.07.036
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Both in-lake and catchment measures designed to reduce phosphorus (P) loading were implemented as part of a 12.3 million USD restoration project for the Minneapolis Chain of lakes in Minnesota (USA). Treatment wetlands, 'in-pipe' measures, and in-lake aluminum sulfate (alum) treatment were applied to restore water quality in the four urban lakes. Different alum dosing methods led to between 4 and 20+ (modeled) years of water quality improvements in these lakes after treatment and only one of the four lakes continues to meet water quality goals approximately 25 years after the project started. Due to limited space and poor performance, reduction of total external loads was low (1-13%) for three lakes. Changes to internal P sediment release rates after application of alum correlated well with epilimnetic total P (TP) concentrations in these lakes, indicating that improvements in water quality were mainly driven by reduced internal loading via in-lake measures. Substantial reductions to external P loading were only achieved at Cedar Lake (49%) via conversion of an existing natural area to a treatment wetland, but even Cedar Lake is no longer meeting management goals. When expressed in terms of dollars spent per unit P removed, in lake alum treatment was on average 50 times more effective than in-catchment measures. The results of this study indicate that substantial external nutrient reductions may not be adequate to sustainably maintain water quality in urban lakes and that continued in-lake management of P accumulated in lake sediment will not only be necessary, but will also be more cost efficient relative to in-catchment measures. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:142 / 152
页数:11
相关论文
共 50 条
  • [1] [Anonymous], 1979, Methods for chemical analysis of water and wastes
  • [2] Comparison of BMP performance using the International BMP Database
    Barrett, Michael E.
    [J]. JOURNAL OF IRRIGATION AND DRAINAGE ENGINEERING, 2008, 134 (05) : 556 - 561
  • [3] Carpenter SR, 1998, ECOL APPL, V8, P559, DOI 10.1890/1051-0761(1998)008[0559:NPOSWW]2.0.CO
  • [4] 2
  • [5] LONG-TERM PHENOMENOLOGICAL MODEL OF PHOSPHORUS AND OXYGEN FOR STRATIFIED LAKES
    CHAPRA, SC
    CANALE, RP
    [J]. WATER RESEARCH, 1991, 25 (06) : 707 - 715
  • [6] Clesceri L, 1998, STANDARD METHODS EXA
  • [7] Cooke D., 2005, RESTORATION MANAGEME, V3rd
  • [8] Cooke G.D., 1999, LAKE RESERV MANAGE, V15, P5, DOI DOI 10.1080/07438149909353948
  • [9] COOKE GD, 1982, WATER RESOUR BULL, V18, P699
  • [10] Phosphate adsorption by fresh and aged aluminum hydroxide. Consequences for lake restoration
    de Vicente, Inmaculada
    Huang, Ping
    Andersen, Frede O.
    Jensen, Henning S.
    [J]. ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2008, 42 (17) : 6650 - 6655