Defining Best Value for Construction Manager/General Contractor Projects: The CMGC Learning Curve

被引:20
|
作者
Gransberg, Douglas D. [1 ]
Shane, Jennifer S. [2 ]
机构
[1] Iowa State Univ, Dept Civil Construct & Environm Engn, Construct Engn, Ames, IA 50011 USA
[2] Iowa State Univ, Dept Civil Construct & Environm Engn, Ames, IA 50011 USA
关键词
Project delivery; Construction management; Managers; Contractors; Alternative project delivery; Construction manager; general contractor; Procurement; Best value; Transportation;
D O I
10.1061/(ASCE)ME.1943-5479.0000275
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Construction manager/general contractor (CMGC) project delivery is rapidly being implemented to deliver the full gamut of highway projects across the United States. One issue that must be resolved before a public transportation agency can advertise a CMGC contract is whether or not to include price in the selection scheme, and if so, how much weight the price component will carry versus all other evaluation criteria. This paper discusses the results of research into this topic based on an analysis of the experience of 26 public transportation agencies on 36 CMGC projects in 14 U.S. states. The paper finds that there is a learning curve that can be mapped as the change in price factor weight over time as an agency gains experience with CMGC, and details that finding via a case study of the Utah Department of Transportation's CMGC program. The paper concludes that non-price factors, such as the CMGC contractor's approach to the preconstruction phase, are more important than price factors and should carry a greater weight in the evaluation plan. It also finds that weight accorded to price factors decreases as an agency gains CMGC experience. Finally, it recommends that agencies that are trying CMGC for the first time focus their selection scheme on factors that will reflect on a given contractor's ability to collaborate with the owner and designer during the preconstruction phases of the project rather than on obtaining the lowest price.
引用
收藏
页数:7
相关论文
共 29 条
  • [1] Construction Manager General Contractor (CMGC) Characteristics and Effective Practices in Transportation Sector
    Dang, Hongtao
    Shane, Jennifer
    CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION PROJECT MANAGEMENT, 2018, : 744 - 754
  • [2] Effective Tools for Projects Delivered by Construction Manager-General Contractor Method
    West, Nicola
    Gransberg, Douglas D.
    McMinimee, James
    TRANSPORTATION RESEARCH RECORD, 2012, (2268) : 33 - 39
  • [3] Comparison of Qualifications-Based Selection and Best-Value Procurement for Construction Manager-General Contractor Highway Construction
    Alleman, Douglas
    Antoine, Arthur
    Gransberg, Douglas D.
    Molenaar, Keith R.
    TRANSPORTATION RESEARCH RECORD, 2017, (2630) : 59 - 67
  • [4] Exploration of Early Work Packaging in Construction Manager-General Contractor Highway Projects
    Alleman, Douglas
    Papajohn, Dean
    Gransberg, Douglas D.
    El Asmar, Mounir
    Molenaar, Keith R.
    TRANSPORTATION RESEARCH RECORD, 2017, (2630) : 68 - 75
  • [5] Contract Administration Tools for Design-Build and Construction Manager/General Contractor Highway Projects
    Papajohn, Dean
    El Asmar, Mounir
    Molenaar, Keith R.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2019, 35 (06)
  • [6] Contractor Performance Evaluation for the Best Value of Superpave Projects
    Elyamany, Ahmed
    Abdelrahman, Magdy
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (05) : 606 - 614
  • [7] Best Value Contractor Selection in Road Construction Projects: ANP-Based Decision Support System
    Hasnain, Muhammad
    Thaheem, Muhammad Jamaluddin
    Ullah, Fahim
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2018, 16 (6A) : 695 - 714
  • [8] Best Value Contractor Selection in Road Construction Projects: ANP-Based Decision Support System
    Muhammad Hasnain
    Muhammad Jamaluddin Thaheem
    Fahim Ullah
    International Journal of Civil Engineering, 2018, 16 : 695 - 714
  • [9] Comparing Construction Manager-General Contractor and Federal Early Contractor Involvement Project Delivery Methods
    Gransberg, Douglas D.
    TRANSPORTATION RESEARCH RECORD, 2016, (2573) : 18 - 25
  • [10] Current Practices of Construction Manager/General Contractor Delivery Method in the Transportation Industry
    Adamtey, Simon
    INTERNATIONAL CONFERENCE ON TRANSPORTATION AND DEVELOPMENT 2019: SMARTER AND SAFER MOBILITY AND CITIES, 2019, : 402 - 413