U-SHAPED ASSEMBLY LINE BALANCING WITH TEMPORARY WORKERS

被引:0
作者
Nakade, Koichi [1 ]
Ito, Akiyasu [1 ]
Ali, Syed Mithun [1 ]
机构
[1] Nagoya Inst Technol, Dept Civil Engn & Syst Management, Showa Ku, Nagoya, Aichi 4668555, Japan
来源
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE | 2015年 / 22卷 / 01期
关键词
u-shaped line; optimal allocation; mathematical formulation; temporary workers; permanent workers; GENETIC ALGORITHM; TIME;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
U-shaped assembly lines are useful in an efficient allocation of workers to stations. In assembly lines, temporary workers are placed to correspond to the fluctuation of demand. Sets of feasible tasks for temporary workers are different from those of permanent workers. The tasks which are familiar to permanent workers also vary. For the U-shaped assembly balancing problem under these situations the optimal cycle times for a given number of temporary workers and the optimal number of workers for given cycle time are derived and compared between U-shaped line balancing and straight line balancing. We also discuss the optimal allocation for a single U-shaped line and two U-shaped lines. In several cases, in particular when high throughputs are required, it is shown numerically that the number of temporary workers in optimal allocation for two lines is less than that of optimal allocation for a single line.
引用
收藏
页码:134 / 146
页数:13
相关论文
共 50 条
  • [31] Optimizing the Efficiency of Straight and U-Shaped Robotic Assembly Lines
    Nilakantan, J. Mukund
    Ponnambalam, S. G.
    SWARM, EVOLUTIONARY, AND MEMETIC COMPUTING, SEMCCO 2014, 2015, 8947 : 582 - 595
  • [32] Worker Allocation in U-shaped Assembly Lines with Multiple Objectives
    Sirovetnukul, R.
    Chutima, P.
    2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2009, : 105 - 109
  • [33] Integrated Assembly Line Balancing with Skilled and Unskilled Workers
    Moon, Ilkyeong
    Shin, Sanghoon
    Kim, Dongwook
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INNOVATIVE AND KNOWLEDGE-BASED PRODUCTION MANAGEMENT IN A GLOBAL-LOCAL WORLD, PT 1, 2014, 438 : 459 - +
  • [34] A geometrical model for managing surface productivity of U-shaped assembly lines
    Gil Vilda, Francisco
    Yague-Fabra, Jose A.
    Sune Torrents, Albert
    Jauregui-Becker, Juan M.
    Wits, Wessel W.
    CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2018, 67 (01) : 479 - 482
  • [35] Multi-objective Optimizer with Collaborative Resource Allocation Strategy for U-shaped Stochastic Disassembly Line Balancing Problem
    Xu, Song
    Guo, XiWang
    Liu, ShiXin
    Qi, Liang
    Qin, Shujin
    Zhao, ZiYan
    Tang, Ying
    2021 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2021, : 2316 - 2321
  • [36] Robust optimization for the integrated worker-cell assignment and sequencing problem in a lean U-shaped assembly line
    Ayough, Ashkan
    Khorshidvand, Behrooz
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 178
  • [37] The U-Shaped Line and a Categorization of the Ocean Disputes in the South China Sea
    Gau, Michael Sheng-Ti
    OCEAN DEVELOPMENT AND INTERNATIONAL LAW, 2012, 43 (01) : 57 - 69
  • [38] Multi-objective Discrete Brainstorming Optimizer for Multiple-product Partial U-shaped Disassembly Line Balancing Problem
    Wu, Kun
    Guo, Xiwang
    Liu, Shixin
    Qi, Liang
    Zhao, Jian
    Zhao, Ziyan
    Wang, Xu
    PROCEEDINGS OF THE 33RD CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2021), 2021, : 305 - 310
  • [39] China's U-Shaped Line in the South China Sea Revisited
    Keyuan, Zou
    OCEAN DEVELOPMENT AND INTERNATIONAL LAW, 2012, 43 (01) : 18 - 34
  • [40] A hybrid constraint programming and cross-entropy approach for balancing U-Shaped disassembly line with flexible workstations and spatial constraints
    Zhang, Yu
    Zhang, Zeqiang
    Chu, Feng
    Mammar, Said
    JOURNAL OF INDUSTRIAL INFORMATION INTEGRATION, 2025, 45