Optimization of Continuous Post-Tensioned Concrete Bridge Girders of Non-Uniform Depth

被引:5
|
作者
Al-Osta, Mohammed A. [1 ]
Azad, Abul K. [1 ]
Al-Gahtani, Husain J. [1 ]
机构
[1] King Fahd Univ Petr & Minerals, Dept Civil Engn, Dhahran 31261, Saudi Arabia
来源
ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING | 2012年 / 37卷 / 02期
关键词
Bridges; Optimization; Post-tensioning; Prestressing force; Prestressing steel; Structures; COST;
D O I
10.1007/s13369-012-0169-6
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
Post-tensioned single-cell concrete box girders of variable depth are used in continuous bridges to achieve both economy and aesthetics. In this paper, the minimum prestressing for a given two- or three-span continuous bridge deck profile is achieved through a constrained optimization procedure using linear programming in conjunction with gradient method of optimization. The constrained nonlinear problem is solved by transforming it to a linear one by introducing a new design variable which proportions long (full length) and short tendons. A gradient search technique is used to solve iteratively the optimization problem. The design variables include interior to exterior span ratio (for three-span), the depth profile of the cross-section, tendon profile, and prestressing force. The total cost of the member is taken as the cost of structural materials (concrete and prestressing steel), excluding the cost of formwork. The design constraints are the prescribed limits on the allowable stresses, ultimate strength, and serviceability requirements as per ACI 343R-95. A purpose-built computer program has been developed to readily determine the optimum prestressing for a given bridge deck profile. From solutions of a number of hypothetical bridge girders using AASHTO H20 bridge loading, several useful results related to design are obtained. Results show that for a symmetrical three-span and two-span continuous bridge girder, the optimum prestressing consists of an optimum arrangement of both long and short tendons, and for a three-span girder of prescribed length, the optimum design is attained at an optimum ratio of interior to exterior span with 1.35 to 1.45.
引用
收藏
页码:265 / 276
页数:12
相关论文
共 50 条
  • [31] DEMOLITION OF POST-TENSIONED CONCRETE
    LINDSELL, P
    CONCRETE, 1975, 9 (01): : 22 - 25
  • [32] POST-TENSIONED CONCRETE SILOS
    HANDA, ML
    JOURNAL OF THE AMERICAN CONCRETE INSTITUTE, 1981, 78 (04): : 324 - 325
  • [33] Post-tensioned concrete floors
    Raiss, Mark
    Concrete (London), 1995, 29 (02): : 27 - 28
  • [34] POST-TENSIONED CONCRETE SILOS
    不详
    JOURNAL OF THE AMERICAN CONCRETE INSTITUTE, 1981, 78 (01): : 54 - 60
  • [35] Continuous acoustic monitoring of grouted post-tensioned concrete bridges
    Cullington, DW
    MacNeil, D
    Paulson, P
    Elliott, J
    NDT & E INTERNATIONAL, 2001, 34 (02) : 95 - 105
  • [36] Experimental Investigation on Nonlinear Flexural Behavior of Post-Tensioned Concrete Bridge Girders with Different Grouting Conditions and Prestress Levels
    Losanno, Daniele
    Galano, Simone
    Parisi, Fulvio
    Pecce, Maria Rosaria
    Cosenza, Edoardo
    JOURNAL OF BRIDGE ENGINEERING, 2024, 29 (03)
  • [37] HORIZONTALLY-CURVED CONTINUOUS POST-TENSIONED CONCRETE BEAMS
    CAMPBELL, TI
    CHITNUYANONDH, L
    JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1975, 20 (02): : 58 - 71
  • [38] Full-scale investigation of post-tensioned prestressed concrete bridge girders subjected to frost heaving in cold regions
    Sun, Baolin
    Yang, Yongqing
    Li, Xiaobin
    Yan, Meng
    Xie, Mingzhi
    Bao, Yi
    Engineering Structures, 2022, 250
  • [39] Full-scale investigation of post-tensioned prestressed concrete bridge girders subjected to frost heaving in cold regions
    Sun, Baolin
    Yang, Yongqing
    Li, Xiaobin
    Yan, Meng
    Xie, Mingzhi
    Bao, Yi
    ENGINEERING STRUCTURES, 2022, 250
  • [40] Full-scale shear tests on post-tensioned bridge girders of existing bridges
    Huber, Patrick
    Vill, Markus
    Schweighofer, Anton
    Kollegger, Johann
    STRUCTURAL CONCRETE, 2018, 19 (01) : 5 - 15