Stochastic and global real time optimization of Tennessee Eastman challenge problem

被引:12
|
作者
Golshan, Masould [1 ]
Pishvaie, Mahmoud Reza [1 ]
Boozarjomehry, Ramin Bozorgmehry [1 ]
机构
[1] Sharif Univ Technol, Dept Chem & Petr Engn, Tehran, Iran
关键词
real time optimization (RTO); heuristic random optimization (HRO); successive quadratic programming(SQP); extended Kalman filter (EKF); Tennessee Eastman process;
D O I
10.1016/j.engappai.2007.04.004
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A stochastic real time optimization (SRTO) which has an efficient result has been implemented on the Tennessee Eastman (TE) challenging problem. In this article a novel Stochastic optimization method, the so-called heuristic random optimization (HRO) proposed by Li & Rhinehart is used which attempts to rationally combine features of both deterministic and random (stochastic) methods. Further, Mu on-line nonlinear identifier via extended Kalman filter (EKF) is used to supply the plant model for model-based optimization algorithm. Using the information obtained from EKF an on-line HRO is accomplished by a random search method whose search directions and steps are considerably reduced by sonic heuristic rules. III order to compare and prove the performance of HRO method, the problem was solved again via sequential quadratic programming (SQP) which is the most efficient algorithms among the deterministic methods. The optimizer initiates every 8 h and determines the optimal set points of the PI controllers in the plant. The calculations are completed in about 15 s by HRO method. Simulations have been done using an Intel P4 2.8 GHz, and 256 MB of RAM. (c) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:215 / 228
页数:14
相关论文
共 50 条
  • [1] A new approach to real time optimization of the Tennessee Eastman challenge problem
    Golshan, M
    Boozarjomehry, RB
    Pishvaie, MR
    CHEMICAL ENGINEERING JOURNAL, 2005, 112 (1-3) : 33 - 44
  • [2] Fuzzy Real-Time Optimization of the Tennessee Eastman Challenge Process
    Golshan, Masoud
    Bozorgmehry Boozarjomehry, Ramin
    Sahlodin, Ali Mohammad
    Pishvaie, Mahmoud Reza
    IRANIAN JOURNAL OF CHEMISTRY & CHEMICAL ENGINEERING-INTERNATIONAL ENGLISH EDITION, 2011, 30 (03): : 31 - 43
  • [3] On-line optimization of the Tennessee Eastman challenge problem
    Duvall, PM
    Riggs, JB
    JOURNAL OF PROCESS CONTROL, 2000, 10 (01) : 19 - 33
  • [4] On-line optimization of the Tennessee Eastman challenge process
    Yan, M
    Ricker, NL
    PROCEEDINGS OF THE 1997 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 1997, : 2960 - 2965
  • [5] Visual method for process monitoring and its application to Tennessee Eastman challenge problem
    Gu, YM
    Zhao, YH
    Wang, H
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2004, : 3423 - 3428
  • [6] BASE CONTROL FOR THE TENNESSEE EASTMAN PROBLEM
    MCAVOY, TJ
    YE, N
    COMPUTERS & CHEMICAL ENGINEERING, 1994, 18 (05) : 383 - 413
  • [7] Decentralized control of the Tennessee Eastman Challenge Process
    Ricker, NL
    JOURNAL OF PROCESS CONTROL, 1996, 6 (04) : 205 - 221
  • [8] A novel use for an old problem: The Tennessee Eastman challenge process as an activating teaching tool
    Udugama, Isuru A.
    Gernaey, Krist, V
    Taube, Michael A.
    Bayer, Christoph
    EDUCATION FOR CHEMICAL ENGINEERS, 2020, 30 : 20 - 31
  • [9] The Tennessee Eastman problem as a process monitoring benchmark
    Howell, J
    Chen, J
    Zhang, J
    (SAFEPROCESS'97): FAULT DETECTION, SUPERVISION AND SAFETY FOR TECHNICAL PROCESSES 1997, VOLS 1-3, 1998, : 223 - 228
  • [10] Identification of the Tennessee Eastman challenge process with subspace methods
    Juricek, BC
    Seborg, DE
    Larimore, WE
    CONTROL ENGINEERING PRACTICE, 2001, 9 (12) : 1337 - 1351