An approach to find task sequence for re-balancing of assembly lines

被引:18
作者
Agpak, Kursad [1 ]
机构
[1] Gaziantep Univ, Dept Ind Engn, Fac Engn, Gaziantep, Turkey
关键词
Assembly; Production cycle; Balancing; HEURISTIC ALGORITHM; CLASSIFICATION; MULTIPLE; MODEL; DESIGN;
D O I
10.1108/01445151011075834
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Purpose - Cycle time fluctuations in assembly lines are one of the important reasons of re balancing As a result of re balancing of assembly lines it will be necessary to change task sequences or equipment locations The purpose of this paper is to find the task sequence which enables assembly line balancing (ALB) with minimum number of stations (NS) for different cycle times such that tasks and equipment or fixture locations remain unchanged Design/methodology/approach - In this paper a heuristic which consist of two stages is proposed to find a common task sequence for different cycle times in assembly lines Findings It is shown that optimal NS for different cycle times can be achieved with a fixed task sequence Research limitations/implications - The approach is limited to a single model case Model variety together with cycle time variety can be investigated in further studies Practical implications - Assembly lines which require less time and cost for re balancing can be easily designed by the proposed approach Originality/value - ALB problem is handled with a new viewpoint Also it is observed that the proposed approach serves as a bridge between assembly line design and balancing In this regard it is thought to have an important place in the ALB literature
引用
收藏
页码:378 / 387
页数:10
相关论文
共 46 条
[1]   U-shaped assembly line layouts and their impact on labor productivity: An experimental study [J].
Aase, GR ;
Olson, JR ;
Schniederjans, MJ .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 156 (03) :698-711
[2]  
AGPAK K, 2006, IMS 2006 5 INT S INT
[3]   Applying genetic algorithms to the U-shaped assembly line balancing problem [J].
Ajenblit, DA ;
Wainwright, RL .
1998 IEEE INTERNATIONAL CONFERENCE ON EVOLUTIONARY COMPUTATION - PROCEEDINGS, 1998, :96-101
[4]  
Arcus A.L., 1966, INT J PROD RES, V4, P259
[5]   A SURVEY OF EXACT ALGORITHMS FOR THE SIMPLE ASSEMBLY LINE BALANCING PROBLEM [J].
BAYBARS, I .
MANAGEMENT SCIENCE, 1986, 32 (08) :909-932
[6]   A survey on problems and methods in generalized assembly line balancing [J].
Becker, C ;
Scholl, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (03) :694-715
[7]   Assembly line balancing: Which model to use when? [J].
Boysen, Nils ;
Fliedner, Malte ;
Scholl, Armin .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 111 (02) :509-528
[8]   A versatile algorithm for assembly line balancing [J].
Boysen, Nils ;
Fliedner, Malte .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 184 (01) :39-56
[9]   A classification of assembly line balancing problems [J].
Boysen, Nils ;
Fliedner, Malte ;
Scholl, Armin .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 183 (02) :674-693
[10]   Sequencing mixed-model assembly lines: Survey, classification and model critique [J].
Boysen, Nils ;
Fliedner, Malte ;
Scholl, Armin .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 192 (02) :349-373