Individuals' Capacities to Apply Transferred Knowledge in AEC Project Teams

被引:32
作者
Garcia, Angelo Joseph [1 ]
Mollaoglu, Sinem [1 ]
机构
[1] Michigan State Univ, Construct Management Program, Sch Planning Design & Construct, E Lansing, MI 48823 USA
基金
美国国家科学基金会;
关键词
Multiteam systems; Interdisciplinary and interorganizational collaboration; Integrated project delivery; Knowledge transfer and application; Absorptive capacity; Articulating capacity; Common knowledge; ABSORPTIVE-CAPACITY; ORGANIZATIONS; PERFORMANCE; INTEGRATION; MANAGEMENT;
D O I
10.1061/(ASCE)CO.1943-7862.0001791
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Architectural, engineering, and construction (AEC) project teams are multiteam systems that temporarily gather individuals with diverse expertise to develop a common project. Individuals in these project teams often fail to use properly knowledge that is transferred to them, especially across disciplinary and organizational boundaries. Consequently, project outcomes are less than optimal in terms of time, cost, and quality. Using a multiple regression model, this study examines the key knowledge-related factors that allow individuals to apply the knowledge transferred to them in AEC project teams. Researchers validated the model using longitudinal data from an AEC project team consisting of more than 160 individuals following the Integrated Project Delivery (IPD) method. Peer-evaluated survey data treated with predictive mean matching to estimate the missing values led to measurement of the study variables for 129 team members from 25 disciplines and 12 organizations. Results show that individuals' absorptive and articulating capacities determine how effectively the individuals can apply received knowledge, although they might lack a wide common knowledge with peers from other disciplines. The study contributes to the body of knowledge by expanding understanding of how AEC project teams and multiteam systems can capitalize on the knowledge-transfer interactions among individuals to optimize project outcomes.
引用
收藏
页数:9
相关论文
共 72 条
[1]   Selection of construction project manager by using Delphi and fuzzy linguistic decision making [J].
Afshari, Ali Reza .
JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2015, 28 (06) :2827-2838
[2]   Review:: Knowledge management and knowledge management systems:: Conceptual foundations and research issues [J].
Alavi, M ;
Leidner, DE .
MIS QUARTERLY, 2001, 25 (01) :107-136
[3]   Knowledge integration in virtual teams: The potential role of KMS [J].
Alavi, M ;
Tiwana, A .
JOURNAL OF THE AMERICAN SOCIETY FOR INFORMATION SCIENCE AND TECHNOLOGY, 2002, 53 (12) :1029-1037
[4]   Digital Boundary Objects as Negotiation Facilitators: Spanning Boundaries in Virtual Engineering Project Networks [J].
Alin, Pauli ;
Iorio, Josh ;
Taylor, John E. .
PROJECT MANAGEMENT JOURNAL, 2013, 44 (03) :48-63
[5]  
[Anonymous], 2007, INT PROJ DEL GUID VE
[6]  
[Anonymous], 2006, INQUIRY BY DESIGN
[7]   Knowledge transfer in organizations: Learning from the experience of others [J].
Argote, L ;
Ingram, P ;
Levine, JM ;
Moreland, RL .
ORGANIZATIONAL BEHAVIOR AND HUMAN DECISION PROCESSES, 2000, 82 (01) :1-8
[8]  
Baiden B. K., 2006, International Journal of Project Management, V24, P13, DOI 10.1016/j.ijproman.2005.05.001
[9]   The effect of integration on project delivery team effectiveness [J].
Baiden, Bernard K. ;
Price, Andrew D. F. .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (02) :129-136
[10]   Structural holes and good ideas [J].
Burt, RS .
AMERICAN JOURNAL OF SOCIOLOGY, 2004, 110 (02) :349-399