Regulation and investment incentives in the electricity distribution networks in Germany

被引:0
作者
Brunekreeft, G. [1 ]
机构
[1] Jacobs Univ Bremen, D-28759 Bremen, Germany
来源
2007 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-10 | 2007年
关键词
electricity; incentive; investment; network; regulation; timing;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
After liberalisation of the electricity market in 1998, Germany relied on negotiated third party access to the electricity networks, basically meaning no regulation of network charges. As expected, this was not effective. In June 2005, the German government installed both a regulator (Bundesnetzagentur, BNetzA) and authorised regulation of electricity network charges. The Energy Act provided for cost based regulation immediately after entry into force and provided an option to switch to incentive regulation later. Meanwhile, cost based regulation is in fact applied, resulting in severe cuts in revenues. Moreover, the regulator presented a concept for incentive regulation to the government at the end of June 2006, aiming to implement incentive regulation by January 1(st) 2008. The concept for the incentive regulation covers all networks, albeit distinguishing several types of networks, among which are 900 electricity distribution networks.
引用
收藏
页码:4911 / 4911
页数:1
相关论文
共 6 条
[1]  
BORRMANN J, 2007, REGULATION TIMING MO
[2]   Policy uncertainty and supply adequacy in electric power markets [J].
Brunekreeft, G ;
McDaniel, T .
OXFORD REVIEW OF ECONOMIC POLICY, 2005, 21 (01) :111-127
[3]   Should merchant transmission investment be subject to a must-offer provision? [J].
Brunekreeft, Gert ;
Newbery, David .
JOURNAL OF REGULATORY ECONOMICS, 2006, 30 (03) :233-260
[4]   Intertemporal price cap regulation under uncertainty [J].
Dobbs, IM .
ECONOMIC JOURNAL, 2004, 114 (495) :421-440
[5]  
KATZ ML, 1987, AM ECON REV, V77, P402
[6]  
Vogelsang I, 2006, ENERG J, V27, P97