Bicriteria in a two-stage flowshop scheduling problem

被引:0
作者
Bagga, PC
Bhambani, A
机构
[1] Univ Delhi, Moti Lal Nehru Coll E, Delhi 110007, India
[2] Univ Delhi, Jesus & Mary Coll, Delhi 110007, India
关键词
scheduling; sequencing; optimization; flowshop;
D O I
暂无
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
This paper proposes a simple and direct procedure for obtaining a sequence which minimizes total flowtime subject to minimum makespan in a two-stage flowshop scheduling problem.
引用
收藏
页码:1475 / 1481
页数:7
相关论文
共 20 条
[3]   SCHEDULING JOBS WITH LINEAR DELAY PENALTIES AND SEQUENCE DEPENDENT SETUP COSTS [J].
BARNES, JW ;
VANSTON, LK .
OPERATIONS RESEARCH, 1981, 29 (01) :146-160
[4]   SCHEDULING OF A SINGLE-MACHINE TO MINIMIZE TOTAL WEIGHTED COMPLETION-TIME SUBJECT TO RELEASE DATES [J].
BIANCO, L ;
RICCIARDELLI, S .
NAVAL RESEARCH LOGISTICS, 1982, 29 (01) :151-167
[5]   A NOTE ON THE SINGLE-MACHINE SCHEDULING PROBLEM WITH MINIMUM WEIGHTED COMPLETION-TIME AND MAXIMUM ALLOWABLE TARDINESS [J].
CHAND, S ;
SCHNEEBERGER, H .
NAVAL RESEARCH LOGISTICS, 1986, 33 (03) :551-557
[6]   BICRITERION STATIC SCHEDULING RESEARCH FOR A SINGLE-MACHINE [J].
DILEEPAN, P ;
SEN, T .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1988, 16 (01) :53-59
[7]   ONE MACHINE SEQUENCING TO MINIMIZE MEAN FLOW TIME WITH MINIMUM NUMBER TARDY [J].
EMMONS, H .
NAVAL RESEARCH LOGISTICS, 1975, 22 (03) :585-592
[8]  
Gupta JN., 1971, AIIE Transactions, V3, P199, DOI [10.1080/05695557108974807, DOI 10.1080/05695557108974807]
[9]   EXTENSION OF A RESULT ON SCHEDULING WITH SECONDARY CRITERIA [J].
HECK, H ;
ROBERTS, S .
NAVAL RESEARCH LOGISTICS, 1972, 19 (02) :403-405
[10]   APPLICATION OF BRANCH AND BOUND TECHNIQUE TO SOME FLOW-SHOP SCHEDULING PROBLEMS [J].
IGNALL, E ;
SCHRAGE, L .
OPERATIONS RESEARCH, 1965, 13 (03) :400-&