Geodynamic Simulation of Ore-Bearing Geological Structural Units by the Example of the Strel'tsovka Uranium Ore Field

被引:3
作者
Petrov, V. A. [1 ]
Leksin, A. B. [1 ]
Pogorelov, V. V. [2 ]
Rebetsky, Yu. L. [2 ]
San'kov, V. A. [3 ]
Ashurkov, S. V. [3 ]
Rasskazov, I. Yu. [4 ]
机构
[1] Russian Acad Sci, Inst Geol Ore Deposits Petrog Mineral & Geochem, Moscow 119017, Russia
[2] Russian Acad Sci, Schmidt Inst Phys Earth, Irkutsk 664033, Russia
[3] Russian Acad Sci, Inst Earth Crust, Siberian Branch, Irkutsk 664003, Russia
[4] Russian Acad Sci, Inst Min, Far East Branch, Khabarovsk, Russia
基金
俄罗斯科学基金会; 俄罗斯基础研究基金会;
关键词
EASTERN TRANSBAIKAL REGION; PALEOSTRESS RECONSTRUCTIONS; BAIKAL REGION; CENTRAL-ASIA; FAULT; ZONE; TECTONOPHYSICS; STATE; CRUST;
D O I
10.1134/S1075701517030047
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Information on designing a 3D integrated model of the deflected mode (DM) of rock massif near the Strel'tsovka uranium ore field (SUOF) in the southeastern Transbaikal region is presented in the paper. This information is based on the contemporary stresses estimated by geostructural and tectonophysical techniques and by studying the seismotectonic deformation of the Earth's surface using the data on earthquake source mechanisms and GPS geodesy focused on the recognition of active faults. A combination of the results of geostructural, geophysical, geotectonic, and petrophysical research, as well as original maps of faulting and the arrangement of seismic dislocations and seismotectonic regimes (stress tensors), allowed us to design models of the structure, properties, and rheological links of the medium and to determine the boundary conditions for numerical tectonophysical simulation using the method of terminal elements. The computed 2D and 3D models of the state of the rock massif have been integrated into 3D GIS created on the basis of the ArcGIS 10 platform with an ArcGIS 3D-Analyst module. The simulation results have been corroborated by in situ observations on a regional scale (the Klichka seismodislocation, active from the middle Pliocene to date) and on a local scale (heterogeneously strained rock massif at the Antei uranium deposit). The development of a regional geodynamic model of geological structural units makes it possible to carry out procedures to ensure the safety of mining operations under complex geomechanical conditions that can expose the operating mines and mines under construction, by the Argun Mining and Chemical Production Association (PAO PPGKhO) on a common methodical and geoinformational platform, to the hazards of explosions, as well as to use the simulation results aimed at finding new orebodies to assess the flanks and deep levels of the ore field.
引用
收藏
页码:183 / 208
页数:26
相关论文
共 67 条
  • [1] Adushkin V.V., 2005, TEKHNOGENNYE PROTSES
  • [2] Andreeva OV, 1996, GEOL ORE DEPOSIT+, V38, P101
  • [3] [Anonymous], 1999, OSR97 SET MAPS GEN S
  • [4] [Anonymous], ISSLEDOVANIE VOLNOVY
  • [5] [Anonymous], 2005, NP06405 FED SLUZHB E
  • [6] [Anonymous], 1989, KATALOG GORNYKH UDAR
  • [7] [Anonymous], 2000, 0632999 RD NTTS BEZ
  • [8] Properties of seismic fault zone waves and their utility for imaging low-velocity structures
    Ben-Zion, Y
    [J]. JOURNAL OF GEOPHYSICAL RESEARCH-SOLID EARTH, 1998, 103 (B6) : 12567 - 12585
  • [9] Characterization of fault zones
    Ben-Zion, Y
    Sammis, CG
    [J]. PURE AND APPLIED GEOPHYSICS, 2003, 160 (3-4) : 677 - 715
  • [10] Bornyakov S.A., 1980, GEOL GEOFIZ, P75