An approach to predictive-reactive scheduling of parallel machines subject to disruptions

被引:31
作者
Duenas, Alejandra [1 ]
Petrovic, Dobrila [1 ]
机构
[1] Coventry Univ, Fac Engn & Comp, CTAC, Dept Knowledge & Informat Management, Coventry CV1 5FB, W Midlands, England
基金
英国工程与自然科学研究理事会;
关键词
D O I
10.1007/s10479-007-0280-3
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, a new predictive-reactive approach to a parallel machine scheduling problem in the presence of uncertain disruptions is presented. The approach developed is based on generating a predictive schedule that absorbs the effects of possible uncertain disruptions through adding idle times to the job processing times. The uncertain disruption considered is material shortage, described by the number of disruption occurrences and disruption repair period. These parameters are specified imprecisely and modelled using fuzzy sets. If the impact of a disruption is too high to be absorbed by the predictive schedule, a rescheduling action is carried out. This approach has been applied to solving a real-life scheduling problem of a pottery company.
引用
收藏
页码:65 / 82
页数:18
相关论文
共 18 条
[1]   Rescheduling job shops under random disruptions [J].
Abumaizar, RJ ;
Svestka, JA .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (07) :2065-2082
[2]   Rescheduling of identical parallel machines under machine eligibility constraints [J].
Alagöz, O ;
Azizoglu, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (03) :523-532
[3]   Executing production schedules in the face of uncertainties: A review and some future directions [J].
Aytug, H ;
Lawley, MA ;
McKay, K ;
Mohan, S ;
Uzsoy, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 161 (01) :86-110
[4]  
BLAZEWICZ J, 1996, SCHEDULING COMPUTER
[5]  
Duenas A, 2005, LECT NOTES ARTIF INT, V3789, P234
[6]   A production rescheduling expert simulation system [J].
Li, H ;
Li, ZC ;
Li, LX ;
Hu, B .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 124 (02) :283-293
[7]   Predictable scheduling of a single machine subject to breakdowns [J].
Mehta, SV ;
Uzsoy, R .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1999, 12 (01) :15-38
[8]   Predictable scheduling of a single machine with breakdowns and sensitive jobs [J].
O'Donovan, R ;
Uzsoy, R ;
McKay, KN .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (18) :4217-4233
[9]   SURVEY OF SCHEDULING RULES [J].
PANWALKAR, SS ;
ISKANDER, W .
OPERATIONS RESEARCH, 1977, 25 (01) :45-61
[10]  
Papoulis A., 1991, PROBABILITY RANDOM V