Effective Flood Control Method in River Downstream Affected by Tidal Effect Using Optimal Operation of Estuary Barrage

被引:2
作者
Kim, Yong-Gun [1 ]
Jo, Myong-Bong [1 ]
Kim, Pyol [2 ]
Oh, Song-Nam [1 ]
Choe, Jong-Hye [1 ]
Kim, Byong-Yon [1 ]
Rim, Hyon-Min [1 ]
机构
[1] Kim II Sung Univ, Fac Global Environm Sci, Dept Hydrol, Pyongyang 999093, South Korea
[2] Kim II Sung Univ, Fac Geol, Pyongyang 999093, South Korea
关键词
Barrage; Downstream; Estuary; Flood mitigation; Optimization; Reservoirs; OPTIMAL RESERVOIR OPERATION; ANT ALGORITHMS; OPTIMIZATION; MODEL;
D O I
10.1061/(ASCE)WW.1943-5460.0000671
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This article introduces an effective flood control method in the downstream of a river through the optimal operation of a barrage that is connected with a sea. A new operating model for flood control of an estuary barrage that can comprehensively evaluate the intensive discharge through the floodgates at the estuary barrage during low tide and the flood propagation process in the downstream river system is proposed. The optimization method applied to the operating model of the barrage combines a one-dimensional hydrodynamic model to analyze the flood propagation process in river channels and a search algorithm based on an iterative method to organize the maximum discharge at the estuary barrage during the ebb tide periods. The proposed method was applied to the flood control of the Taedong River downstream in the Democratic People's Republic of Korea, and its effectiveness was shown and evaluated through modeling results. By imagining the downstream boundary of the river before and after the construction of the West Sea Barrage, the inundation simulation at the Taean gauging station in the downstream of the Taedong River for floods of different average recurrence interval (ARI) was achieved by employing the proposed method.
引用
收藏
页数:13
相关论文
共 27 条
[1]  
Afshar Abbas, 2008, 2008 8th International Conference on Hybrid Intelligent Systems (HIS), P13, DOI 10.1109/HIS.2008.121
[2]   Partially and Fully Constrained Ant Algorithms for the Optimal Solution of Large Scale Reservoir Operation Problems [J].
Afshar, M. H. ;
Moeini, R. .
WATER RESOURCES MANAGEMENT, 2008, 22 (12) :1835-1857
[3]   Optimization-simulation for short-term reservoir operation under flooding conditions [J].
Bayat, Babak ;
Mousavi, S. Jamshid ;
Namin, Masoud Montazeri .
JOURNAL OF WATER SUPPLY RESEARCH AND TECHNOLOGY-AQUA, 2011, 60 (07) :434-447
[4]  
Brunner G.W., 1995, HEC RAS RIVER ANAL S
[5]   Optimizing the reservoir operating rule curves by genetic algorithms [J].
Chang, FJ ;
Chen, L ;
Chang, LC .
HYDROLOGICAL PROCESSES, 2005, 19 (11) :2277-2289
[7]   Development of an Optimization/Simulation Model for Real-Time Flood-Control Operation of River-Reservoirs Systems [J].
Che, Daniel ;
Mays, Larry W. .
WATER RESOURCES MANAGEMENT, 2015, 29 (11) :3987-4005
[8]   Fuzzy iteration methodology for reservoir flood control operation [J].
Cheng, CT ;
Chau, KW .
JOURNAL OF THE AMERICAN WATER RESOURCES ASSOCIATION, 2001, 37 (05) :1381-1388
[9]   Ant algorithms for discrete optimization [J].
Dorigo, M ;
Di Caro, G ;
Gambardella, LM .
ARTIFICIAL LIFE, 1999, 5 (02) :137-172
[10]   OPTIMIZATION OF OPERATION OF A MULTIPLE-PURPOSE RESERVOIR BY DYNAMIC PROGRAMMING [J].
HALL, WA ;
BUTCHER, WS ;
ESOGBUE, A .
WATER RESOURCES RESEARCH, 1968, 4 (03) :471-&