Capitalising teamwork for enhancing project delivery and management in construction: empirical study in Malaysia

被引:27
作者
Yap, Jeffs Ey Boon Hui [1 ]
Leong, Wen Jie [1 ]
Skitmore, Martin [2 ,3 ]
机构
[1] UTAR, Lee Kong Chian Fac Engn & Sci, Dept Surveying, Kajang, Malaysia
[2] Queensland Univ Technol, Sch Civil Engn & Built Environm, Brisbane, Qld, Australia
[3] Tongji Univ, Sch Econ & Management, Res Inst Complex Engn & Management, Shanghai, Peoples R China
关键词
Construction; Teamwork; Team effectiveness; Dimensions; Temporary project team; Project management; CRITICAL SUCCESS FACTORS; ORGANIZATIONAL CULTURE; PERFORMANCE; KNOWLEDGE; DELAYS; MODEL; COLLABORATION; TEAMS;
D O I
10.1108/ECAM-10-2019-0581
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Teamwork in the construction industry has attracted much attention from both academic and industrial circles. Most importantly, improving team effectiveness will increase the likelihood of successful project delivery. Recognising the factors influencing team dynamics is important for enhanced team performance. Design/methodology/approach Based on a detailed literature review, a survey questionnaire containing 10 aspects and 25 attributes of teamwork relevant to construction is used to collect feedback from Malaysian construction practitioners from client, consultant and contractor organisations to prioritise these hypothesised variables. The data are then subjected to reliability analysis, descriptive statistics (means, standard deviations, and frequencies), a one-sample t-test, the Kruskal-Wallis ANOVA and exploratory factor analysis. Findings The significance of these aspects and attributes is then presented. The three most crucial aspects are "project performance", "decision-making capability" and "problem-solving ability". The most influential attributes are "effective communication between project team members", "efficient team leadership", "well-defined team responsibilities and roles", "clear team goals and objectives" and "good collaboration between all project leaders". The Kruskal-Wallis ANOVA reveals five attributes having statistically significant differences with respect to company size, namely "clear team goals and objectives", "commitment to the project", "adequate resources", "team or task processes" and "creativity and innovation". Six underlying dimensions are found, comprising (1) participative engagement and task commitment; (2) team responsibility structure and accountability; (3) culture of trust and respect; (4) leader's skills and abilities; (5) top management support; and (6) synergic working environment. Practical implications - The identification of these dimensions for team effectiveness provides rigorous basis for formulating useful team-building strategies for integrating a collaborative environment among project stakeholders and consequently improving project performance. Originality/value This paper bridges the identified knowledge gap concerning the dimensionality of teamwork attributes in construction-based setting and adds to existing knowledge of how team effectiveness can be leveraged to improve project performance in the construction management literature.
引用
收藏
页码:1479 / 1503
页数:25
相关论文
共 50 条
  • [31] Construction Project Management for a Construction Company: a Case Study of a New Urban Waste Treatment and Recovering Plant
    Camprini, Matteo
    Frassinetti, Ares
    Gambi, Andrea
    [J]. IN BO-RICERCHE E PROGETTI PER IL TERRITORIO LA CITTA E L ARCHITETTURA, 2013, 4 (02): : 105 - 132
  • [32] A study on the performance evaluation of construction project integrated management
    Yan Wen-zhou
    Niu Jia
    [J]. PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (14TH) VOLS 1-3, 2007, : 2351 - +
  • [33] Agile project management for sustainable residential construction: A study of critical success factors
    Kineber, Ahmed Farouk
    Oke, Ayodeji Emmanuel
    Elshaboury, Nehal
    Abunada, Ziyad
    Elseknidy, Mohamed
    Zamil, Ahmad
    Alhusban, Mohammad
    Ilori, Samuel Adebobola
    [J]. FRONTIERS IN BUILT ENVIRONMENT, 2024, 10
  • [34] Student evaluation of a virtual experience for project management learning: An empirical study for learning improvement
    Gonzalez-Marcos, Ana
    Alba-Elias, Fernando
    Navaridas-Nalda, Fermin
    Ordieres-Mere, Joaquin
    [J]. COMPUTERS & EDUCATION, 2016, 102 : 172 - 187
  • [35] Empirical Study on Data-Based Tailoring in Project Management
    Schidek, Anna
    Doering, Claudia
    Timinger, Holger
    [J]. HUMAN-CENTRED TECHNOLOGY MANAGEMENT FOR A SUSTAINABLE FUTURE, VOL 3, IAMOT 2024, 2025, : 69 - 77
  • [36] COMPETENCE MANAGEMENT IN PROJECT MANAGEMENT: STUDY IN LARGE COMPANIES IN THE SECTOR OF CONSTRUCTION IN MINAS GERAIS, BRAZIL.
    Carvalho Lima, Reginaldo de Jesus
    Aragao, Silvano
    Rodrigues Guimaraes, Eloisa Helena
    [J]. REVISTA DE GESTAO E PROJETOS, 2016, 7 (02): : 42 - 53
  • [37] AN EMPIRICAL STUDY ON THE IMPLEMENTATION OF PROJECT RISK MANAGEMENT IN SPANISH SMES
    Lima, Ferreira de Araujo Priscila
    Marcelino-Sadaba, Sara
    Echeverria-Lazcano, Angel Maria
    Verbano, Chiara
    [J]. BUSINESS MANAGEMENT THEORIES AND PRACTICES IN A DYNAMIC COMPETITIVE ENVIRONMENT, 2019, : 1635 - 1638
  • [38] Assessing Adoption of Project Management Knowledge Areas and Maturity Level: Case Study of a Public Agency in Malaysia
    Abdul Rasid, Siti Zaleha
    Wan Ismail, Wan Khairuzzaman
    Mohammad, Nor Hazlin
    Long, Choi Sang
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (02) : 264 - 271
  • [39] Fuzzy based risk assessment module for metropolitan construction project: An empirical study
    Samantra, Chitrasen
    Datta, Saurav
    Mahapatra, Siba Sankar
    [J]. ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2017, 65 : 449 - 464
  • [40] Study of dependencies in a risk management process: case of a construction project
    Lmoussaoui, Hafida
    Jamouli, Hicham
    [J]. PROCEEDINGS OF 2014 2ND IEEE INTERNATIONAL CONFERENCE ON LOGISTICS AND OPERATIONS MANAGEMENT (GOL 2014), 2014, : 112 - 117