4D dynamic construction management and visualization software: 2. Site trial

被引:18
作者
Chau, KW [1 ]
Anson, M [1 ]
De Saram, DD [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Civil & Struct Engn, Hong Kong, Hong Kong, Peoples R China
关键词
4D site management; construction planning; scheduling; site trial;
D O I
10.1016/j.autcon.2004.11.005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The performance of any system can only be gauged by practical applications. This paper delineates some insight and experience on the on-site use of a prototype four-dimensional (4D) site management software system for a warehouse superstructure in Hong Kong. It links a three-dimensional model and a construction schedule to furnish visualization of the state of a site at any user-specified date. Site personnel generally view this system as potentially very promising and helpful. The 4D visualization is found to have capability to assist cognitive, reflective and analytical activities of site management. Through this site trial, some limitations of the software are also spotted which consequently lead to enhancement to the system. The prototype model may require a large amount of data input for large projects which lead to large computer files and slow processing speed. Hence, careful implementation of details is required in the planning level for practical 4D simulation modeling. This, however, will not be a long-term problem, given the recent advancement of computer technology. (c) 2004 Elsevier B.V. All rights reserved.
引用
收藏
页码:525 / 536
页数:12
相关论文
共 7 条
[1]   Applicability of e-Work models for the automation of construction materials management systems [J].
Castro-Lacouture, D ;
Skibniewski, MJ .
PRODUCTION PLANNING & CONTROL, 2003, 14 (08) :789-797
[2]   4D dynamic construction management and visualization software: 1. Development [J].
Chau, KW ;
Anson, M ;
Zhang, JP .
AUTOMATION IN CONSTRUCTION, 2005, 14 (04) :512-524
[3]   Implementation of visualization as planning and scheduling tool in construction [J].
Chau, KW ;
Anson, M ;
Zhang, JP .
BUILDING AND ENVIRONMENT, 2003, 38 (05) :713-719
[4]   Application of data warehouse and Decision Support System in construction management [J].
Chau, KW ;
Cao, Y ;
Anson, M ;
Zhang, JP .
AUTOMATION IN CONSTRUCTION, 2003, 12 (02) :213-224
[5]   Construction coordination activities: What is important and what consumes time [J].
de Saram, DD ;
Ahmed, SM .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2001, 17 (04) :202-213
[6]   Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach [J].
Son, J ;
Skibniewski, MJ .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (01) :23-31
[7]  
ZHANG JP, 1996, THESIS HONG KONG POL