Supply Chain Inventory Model with Markov Chain Demand

被引:0
作者
Lin, Zhi-Ping [1 ]
Ho, Su-Ping [1 ]
机构
[1] Natl Taipei Univ & Technol, Dept Ind Engn & Management, Taipei, Taiwan
来源
JOURNAL OF MARINE SCIENCE AND TECHNOLOGY-TAIWAN | 2021年 / 29卷 / 04期
关键词
Supply chain management (SCM); Markov chain; Demand forecasting; LOT-SIZE MODEL; VARIABLE LEAD-TIME; VENDOR; MANAGEMENT; PURCHASER;
D O I
10.51400/2709-6998.1585
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study aims to develop a new one-vendor multiple-buyers integrated inventory model. We believe that our proposed model can forecast the demand of all buyers in the coming future by using data that have already existed and to minimize the total cost-for both buyers and vendors. In recent days, the Markov chain approach has played one of the critical methods of demand forecasting in the Supply Chain Management (SCM) field. The proposed model of this study is to analysis the demand of all buyers in one specific season that was impacted by the demand in the same season from last year. Finally, the results of this article discover the most optimal number of buyers and shipments, and the quantity of demand per period. Furthermore, a sensitivity analysis is also conducted to find out the sensitivity of the new model.
引用
收藏
页码:498 / 513
页数:16
相关论文
共 26 条
[1]   Joint economic lot sizing problem for a three-Layer supply chain with stochastic demand [J].
Abdelsalam, Hisham M. ;
Elassal, Magy M. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 155 :272-283
[2]  
[Anonymous], 2015, ADV IND ENG MANAGE
[3]   A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR [J].
BANERJEE, A .
DECISION SCIENCES, 1986, 17 (03) :292-311
[4]   An integrated production inventory model with raw material replenishment considerations in a three layer supply chain [J].
Ben-Daya, Mohammed ;
As'ad, Rami ;
Seliaman, Mohammed .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 143 (01) :53-61
[5]   Inventory management with variable lead-time dependent procurement cost [J].
Chandra, Charu ;
Grabis, Janis .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2008, 36 (05) :877-887
[6]  
Christoph HG, 2014, COMPUT IND ENG, V70, P31
[7]  
Eugene S., 2006, MAM2006 MARK ANN M R, P1
[8]   A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR - A COMMENT [J].
GOYAL, SK .
DECISION SCIENCES, 1988, 19 (01) :236-241
[10]   A vendor-buyer integrated production-inventory model with normal distribution of lead time [J].
Hoque, M. A. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 144 (02) :409-417