Production quality improvement during manufacturing systems ramp-up

被引:28
作者
Colledani, M. [1 ,2 ]
Tolio, T. [1 ,2 ]
Yemane, A. [1 ]
机构
[1] Politecn Milan, Dept Mech Engn, Via la Masa 1, I-20156 Milan, Italy
[2] CNR, ITIA, Inst Ind Technol & Automat, Via Bassini 15, I-20133 Milan, Italy
关键词
Production quality; Manufacturing systems; Ramp-up; CYBER-PHYSICAL SYSTEMS; START-UP; MANAGEMENT; DESIGN; OPERATIONS; TIME; PRINCIPLES; STREAM;
D O I
10.1016/j.cirpj.2018.07.001
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In the current manufacturing context, characterized by short product life-cycles, large product variety, product customization and short innovation cycles, achieving target production quality performance is challenging, especially due to the frequent ramp-up phases the system undergoes along its life-cycle. Available production quality methods focus on high-volume productions and long-term system performance, while they lose effectiveness during the system ramp-up, where instability and unknown disturbances affect the system dynamics. This paper proposes a reference framework for improving production quality performance during the system ramp-up phase. Two strategies for properly dealing with this problem are discussed, consisting in anticipating ramp-up problems during the design phase and performing continuous improvement of production quality performance measures during the system ramp-up. The most effective approaches following these strategies are revised and future research directions in this new research area are drawn. (C) 2018 CIRP.
引用
收藏
页码:197 / 206
页数:10
相关论文
共 60 条
  • [1] Procurement of Reconfigurable Assembly System a Justification for Effective Production ramp- up planning
    Ali-Qureshi, Zulfiqar
    ElMaraghy, Waguih H.
    [J]. PRODUCT SERVICES SYSTEMS AND VALUE CREATION: PROCEEDINGS OF THE 6TH CIRP CONFERENCE ON INDUSTRIAL PRODUCT-SERVICE SYSTEMS, 2014, 16 : 164 - 169
  • [2] Towards a framework for analyzing efficiency during start-up: An empirical investigation of a Swedish auto manufacturer
    Almgren, H
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1999, 60-1 : 79 - 86
  • [3] Pilot production and manufacturing start-up: the case of Volvo S80
    Almgren, H
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (17) : 4577 - 4588
  • [4] [Anonymous], IJFMS INT J FLEXIBLE
  • [5] Big Data and virtualization for manufacturing cyber-physical systems: A survey of the current status and future outlook
    Babiceanu, Radu F.
    Seker, Remzi
    [J]. COMPUTERS IN INDUSTRY, 2016, 81 : 128 - 137
  • [6] Modelling production ramp-up of engineering products
    Ball, P. D.
    Roberts, S.
    Natalicchio, A.
    Scorzafave, C.
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2011, 225 (B6) : 959 - 971
  • [7] Solution Principles for Managing Instabilities in Ramp-Up
    Basse, Isabel
    Schmitt, Sebastian
    Gartzen, Thomas
    Schmitt, Robert
    [J]. 2ND ICRM 2014 INTERNATIONAL CONFERENCE ON RAMP-UP MANAGEMENT, 2014, 20 : 93 - 97
  • [8] Scalable Ramp-Up of Hybrid Manufacturing Systems
    Basse, Isabel
    Sauer, Alexander
    Schmitt, Robert
    [J]. 2ND ICRM 2014 INTERNATIONAL CONFERENCE ON RAMP-UP MANAGEMENT, 2014, 20 : 1 - 6
  • [9] Berg M., 2006, MANAGING PRODUCTION
  • [10] The economics of yield-driven processes
    Bohn, RE
    Terwiesch, C
    [J]. JOURNAL OF OPERATIONS MANAGEMENT, 1999, 18 (01) : 41 - 59