Joint Operation of the Multi-Reservoir System of the Three Gorges and the Qingjiang Cascade Reservoirs

被引:68
作者
Guo, Shenglian [1 ]
Chen, Jionghong [1 ]
Li, Yu [1 ]
Liu, Pan [1 ]
Li, Tianyuan [1 ]
机构
[1] Wuhan Univ, State Key Lab Water Resources & Hydropower Engn S, Wuhan 430072, Peoples R China
关键词
cascade reservoirs; multi-reservoir system; joint operation; hydropower generation; progressive optimality algorithm; MULTIRESERVOIR SYSTEMS; GENETIC ALGORITHMS; NEURAL-NETWORK; OPTIMIZATION; MODEL; SIMULATION; RULES;
D O I
10.3390/en4071036
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Optimal utilization of available water resources has become more urgent due to the rapid growth of the economy and population. The joint operation of the Three Gorges cascade and Qingjiang cascade reservoirs in China was studied in this paper. Choosing maximization of hydropower generation and hydropower revenue as objective functions respectively, optimal models were established for individual and joint operation of the cascade reservoirs. The models were solved by the progressive optimality algorithm. The storage and electric compensation benefits among cascade reservoirs were analyzed. The daily inflow data of consecutive hydrological years of 1982-1987 were selected for a case study. Compared with the design operation rule, the joint operation of the multi-reservoir system can generate 5.992 billion kWh of extra power or an increase of 5.70% by the objective function of maximum hydropower generation. Through reservoir storage compensation, the spilled water of the Three Gorges and Qingjiang cascade reservoirs was decreased by 78.741 and 5.384 billion m(3), respectively.
引用
收藏
页码:1036 / 1050
页数:15
相关论文
共 25 条
[1]  
Bellman R. E., 1957, Dynamic programming. Princeton landmarks in mathematics
[2]  
Bertsekas D. P., 1976, DYNAMIC PROGRAMMING
[3]   DERIVATION OF MONTHLY RESERVOIR RELEASE POLICIES [J].
BHASKAR, NR ;
WHITLATCH, EE .
WATER RESOURCES RESEARCH, 1980, 16 (06) :987-993
[4]   Multireservoir modeling with dynamic programming and neural networks [J].
Chandramouli, V ;
Raman, H .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 2001, 127 (02) :89-98
[5]   Real-Coded Genetic Algorithm for Rule-Based Flood Control Reservoir Management [J].
Chang, Fi-John ;
Chen, Li .
WATER RESOURCES MANAGEMENT, 1998, 12 (03) :185-198
[6]   A reservoir flood forecasting and control system for China [J].
Guo, SL ;
Zhang, HG ;
Chen, H ;
Peng, DZ ;
Liu, P ;
Pang, B .
HYDROLOGICAL SCIENCES JOURNAL-JOURNAL DES SCIENCES HYDROLOGIQUES, 2004, 49 (06) :959-972
[7]   Reservoir operation using the neural network and fuzzy systems for dam control and operation support [J].
Hasebe, M ;
Nagayama, Y .
ADVANCES IN ENGINEERING SOFTWARE, 2002, 33 (05) :245-260
[8]   NEW ALGORITHM FOR SOLUTION OF MULTISTATE DYNAMIC-PROGRAMMING PROBLEMS [J].
HOWSON, HR ;
SANCHO, NGF .
MATHEMATICAL PROGRAMMING, 1975, 8 (01) :104-116
[9]  
KARAMOUZ M, 1987, WATER RESOUR BULL, V23, P1
[10]   Optimal operation of multireservoir systems: State-of-the-art review [J].
Labadie, JW .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2004, 130 (02) :93-111