Two-agent scheduling with position-based deteriorating jobs and learning effects

被引:50
作者
Cheng, T. C. E. [2 ]
Wu, Wen-Hsiang [3 ]
Cheng, Shuenn-Ren [4 ]
Wu, Chin-Chia [1 ]
机构
[1] Feng Chia Univ, Dept Stat, Taichung 40724, Taiwan
[2] Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R China
[3] Yuanpei Univ, Dept Healthcare Management, Hsinchu, Taiwan
[4] Cheng Shiu Univ, Grad Inst Business Adm, Kaohsiung Cty, Taiwan
关键词
Scheduling; Two-agent; Simulated annealing; Position-based learning; Position-based deteriorating; DEPENDENT PROCESSING TIMES; TOTAL COMPLETION-TIME; SINGLE-MACHINE; FLOWSHOP; MINIMIZE;
D O I
10.1016/j.amc.2011.04.005
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
Scheduling with deteriorating jobs and learning effects has been widely studied. However, multi-agent scheduling with simultaneous considerations of deteriorating jobs and learning effects has hardly been considered until now. In view of this, we consider a two-agent single-machine scheduling problem involving deteriorating jobs and learning effects simultaneously. In the proposed model, given a schedule, we assume that the actual processing time of a job of the first agent is a function of position-based learning while the actual processing time of a job of the second agent is a function of position-based deterioration. The objective is to minimize the total weighted completion time of the jobs of the first agent with the restriction that no tardy job is allowed for the second agent. We develop a branch-and-bound and several simulated annealing algorithms to solve the problem. Computational results show that the proposed algorithms are efficient in producing near-optimal solutions. (C) 2011 Elsevier Inc. All rights reserved.
引用
收藏
页码:8804 / 8824
页数:21
相关论文
共 55 条
[21]   SINGLE FACILITY SCHEDULING WITH NONLINEAR PROCESSING TIMES [J].
GUPTA, JND ;
GUPTA, SK .
COMPUTERS & INDUSTRIAL ENGINEERING, 1988, 14 (04) :387-393
[22]   Generating experimental data for computational testing with machine scheduling applications [J].
Hall, NG ;
Posner, ME .
OPERATIONS RESEARCH, 2001, 49 (06) :854-865
[23]   A new approach to the learning effect: Beyond the learning curve restrictions [J].
Janiak, Adam ;
Rudek, Radoslaw .
COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (11) :3727-3736
[24]   OPTIMIZATION BY SIMULATED ANNEALING [J].
KIRKPATRICK, S ;
GELATT, CD ;
VECCHI, MP .
SCIENCE, 1983, 220 (4598) :671-680
[25]   Minimizing total completion time in a two-machine flowshop with a learning effect [J].
Lee, WC ;
Wu, CC .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2004, 88 (01) :85-93
[26]   A two-machine flowshop problem with two agents [J].
Lee, Wen-Chiung ;
Chen, Shiuan-Kang ;
Chen, Cheng-Wei ;
Wu, Chin-Chia .
COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) :98-104
[27]   A single-machine scheduling problem with two-agent and deteriorating jobs [J].
Lee, Wen-Chiung ;
Wang, Wei-Jhe ;
Shiau, Yau-Ren ;
Wu, Chin-Chia .
APPLIED MATHEMATICAL MODELLING, 2010, 34 (10) :3098-3107
[28]   Branch-and-bound and simulated annealing algorithms for a two-agent scheduling problem [J].
Lee, Wen-Chiung ;
Chen, Shiuan-kang ;
Wu, Chin-Chia .
EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (09) :6594-6601
[29]   Two-agent single-machine scheduling with position-dependent processing times [J].
Liu, Peng ;
Zhou, Xiaoye ;
Tang, Lixin .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 48 (1-4) :325-331
[30]   A HEURISTIC ALGORITHM FOR THE M-MACHINE, N-JOB FLOWSHOP SEQUENCING PROBLEM [J].
NAWAZ, M ;
ENSCORE, EE ;
HAM, I .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1983, 11 (01) :91-95