Bayesian network-based risk evaluation model for the operational requirements of the China Railway Express under the Belt and Road initiative

被引:1
|
作者
Feng, Fenling [1 ,2 ]
Jia, Junjie [1 ,2 ]
Liang, Ailan [1 ,2 ]
Liu, Chengguang [1 ,2 ]
机构
[1] Cent South Univ, Sch Traff & Transportat Engn, Changsha 410075, Hunan, Peoples R China
[2] Cent South Univ, Rail Data Res & Applicat Key Lab Hunan Prov, Changsha 410075, Hunan, Peoples R China
关键词
Risk evaluation; Bayesian network; China railway express; risk-management suggestion; NEURAL-NETWORK; PREDICTION; ACCIDENTS;
D O I
10.1093/tse/tdac019
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
The operation of the China Railway Express features numerous links across several regions and countries. Effectively controlling the risks involved in the operation of the China Railway Express is crucial for ensuring safety and efficiency and promoting the sustainable development of the China Railway Express. The Bayesian network-based risk-management model was built corresponding to the actual operation of the China Railway Express; the model used an advanced risk-management theory. The sensitivity analysis of risk factors and Bayesian network inference were realized using the expectation-maximization and clique-tree propagation algorithms. Using the risk-checklist method, 17 risk-related factors were analysed on 17 nodes of the Bayesian network from three perspectives-safety, efficiency and effectiveness-based on expert opinions and the actual operating conditions of the China Railway Express. Data from a sensitivity analysis and evidence inference of the Bayesian network model indicated that the sensitivity coefficients of nodes N01, N04, N07, N08 and N17 of the network were high. Moreover, the risk-occurrence probabilities for nodes N01, N04, N06, N07 and N09 were higher in the case of reverse inference. Our results revealed the crucial factors influencing the risk. The identified risk factors included the stability of the political environment in countries along the route, conditions of station infrastructures and the complexity of the process of changing rails and reloading. Further, risk-management suggestions were provided. By establishing a sound risk-management framework, reliable assessment and management could be realized in accordance with changes in the operating conditions of the China Railway Express.
引用
收藏
页数:14
相关论文
共 21 条
  • [1] China Railway Express Subsidy Model Based on Game Theory under "the Belt and Road" Initiative
    Feng, Fenling
    Zhang, Tianzuo
    Liu, Chengguang
    Fan, Lifeng
    SUSTAINABILITY, 2020, 12 (05)
  • [2] Hinterland patterns of China Railway (CR) express in China under the Belt and Road Initiative: A preliminary analysis
    Jiang, Yonglei
    Sheu, Jiuh-Biing
    Peng, Zixuan
    Yu, Bin
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2018, 119 : 189 - 201
  • [3] European hub location problem for China Railway Express in the context of the Belt and Road Initiative
    Zhao, Laijun
    Stoeter, Johan
    Li, Huiyong
    Hu, Qingmi
    Cheng, Zhaolin
    Wang, Xiaoli
    INTERNATIONAL JOURNAL OF LOGISTICS-RESEARCH AND APPLICATIONS, 2020, 23 (06) : 561 - 579
  • [4] A Sustainable Transport Competitiveness Analysis of the China Railway Express in the Context of the Belt and Road Initiative
    Li, Shiqi
    Lang, Maoxiang
    Yu, Xueqiao
    Zhang, Mingyue
    Jiang, Minghe
    Tsai, Sangbing
    Wang, Cheng-Kuang
    Bian, Fang
    SUSTAINABILITY, 2019, 11 (10)
  • [5] Less-than-container cargo scheduling for China Railway Express along belt and road initiative routes
    Zhou, Yanjie
    He, Zhanwen
    Liu, Chengcheng
    Zhang, Jingrong
    Li, Yumin
    Wang, Yan
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2025, 197
  • [6] Hybrid MCDM Model for Location of Logistics Hub: A Case in China Under the Belt and Road Initiative
    Zhang, Xinfang
    Lu, Jing
    Peng, Yan
    IEEE ACCESS, 2021, 9 (09): : 41227 - 41245
  • [7] Improved Bayesian Network-Based Risk Model and Its Application in Disaster Risk Assessment
    Ming Li
    Mei Hong
    Ren Zhang
    International Journal of Disaster Risk Science, 2018, 9 : 237 - 248
  • [8] Improved Bayesian Network-Based Risk Model and Its Application in Disaster Risk Assessment
    Li, Ming
    Hong, Mei
    Zhang, Ren
    INTERNATIONAL JOURNAL OF DISASTER RISK SCIENCE, 2018, 9 (02) : 237 - 248
  • [9] Improved Bayesian Network-Based Risk Model and Its Application in Disaster Risk Assessment
    Ming Li
    Mei Hong
    Ren Zhang
    International Journal of Disaster Risk Science, 2018, 9 (02) : 237 - 248
  • [10] Risk Evaluation of Railway Business Line Construction Plan Based on Analytic Hierarchy Process and Bayesian Network
    Di, Xiaoxin
    Li, Xiangqian
    Zhou, Linchai
    Xiao, Wei
    Yue, Yixiang
    2020 IEEE 5TH INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION ENGINEERING (IEEE ICITE 2020), 2020, : 219 - 223