Key challenges in automation of earth-moving machines

被引:163
|
作者
Dadhich, S. [1 ]
Bodin, U. [1 ]
Andersson, U. [1 ,2 ]
机构
[1] Lulea Univ Technol, Dept Comp Sci Elect & Space Engn, SE-97187 Lulea, Sweden
[2] ProcessIT Innovat, SE-97187 Lulea, Sweden
关键词
Earth-moving; Automation; Loader; Short loading cycle; OF-THE-ART; ROBOTIC EXCAVATION; ROCK; GENERATION; OPERATION; POSITION; DESIGN; CYCLE;
D O I
10.1016/j.autcon.2016.05.009
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A wheel loader is an earth-moving machine used in construction sites, gravel pits and mining to move blasted rock, soil and gravel. In the presence of a nearby dump truck, the wheel loader is said to be operating in a short loading cycle. This paper concerns the moving of material (soil, gravel and fragmented rock) by a wheel loader in a short loading cycle with more emphasis on the loading step. Due to the complexity of bucket environment interactions, even three decades of research efforts towards automation of the bucket loading operation have not yet resulted in any fully autonomous system. This paper highlights the key challenges in automation and tele-remote operation of earth-moving machines and provides a survey of different areas of research within the scope of the earth-moving operation. The survey of publications presented in this paper is conducted with an aim to highlight the previous and ongoing research work in this field with an effort to strike a balance between recent and older publications. Another goal of the survey is to identify the research areas in which knowledge essential to automate the earth moving process is lagging behind. The paper concludes by identifying the knowledge gaps to give direction to future research in this field. (C) 2016 The Authors. Published by Elsevier B.V.
引用
收藏
页码:212 / 222
页数:11
相关论文
共 50 条
  • [31] 50TH ANNIVERSARY OF KRUPP EARTH-MOVING
    KRUMREY, A
    TECHNISCHE MITTEILUNGEN KRUPP WERKSBERICHTE, 1971, 29 (01): : 9 - &
  • [32] Aggregate-Forming Planner for Autonomous Earth-Moving
    Shaked, Tom
    Bar-Sinai, Karen Lee
    Meles-Braverman, Ari
    Elmakis, Oren
    Degani, Amir
    IEEE ACCESS, 2023, 11 : 118841 - 118848
  • [33] A NOISE AND HEARING SURVEY OF EARTH-MOVING EQUIPMENT OPERATORS
    LABENZ, P
    COHEN, A
    PEARSON, B
    AMERICAN INDUSTRIAL HYGIENE ASSOCIATION JOURNAL, 1967, 28 (02): : 117 - &
  • [34] Earth-moving and hydraulic engineering - The dam "Calles" in Mexico
    Schwilling, H
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1929, 73 : 1557 - 1558
  • [35] Forcing the diesel engines of the earth-moving tractor units
    Pogulyaev, Yu.D.
    Sergeeva, V.M.
    Mekhanizatsiya Stroitel'stva, 2002, (06): : 19 - 22
  • [36] A framework for incorporating dynamic strategies in earth-moving simulations
    Kannan, G
    Martinez, JC
    Vorster, MC
    PROCEEDINGS OF THE 1997 WINTER SIMULATION CONFERENCE, 1997, : 1119 - 1126
  • [37] A NEW APPROACH FOR OPTIMIZING EARTH-MOVING OPERATIONS .2.
    JAYAWARDANE, AKW
    PRICE, ADF
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-TRANSPORT, 1994, 105 (04) : 249 - 258
  • [38] A NEW APPROACH FOR OPTIMIZING EARTH-MOVING OPERATIONS .1.
    JAYAWARDANE, AKW
    PRICE, ADF
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-TRANSPORT, 1994, 105 (03) : 195 - 207
  • [39] HACKNEYED CABS + DESIGNING CABS OF AGRICULTURAL AND EARTH-MOVING VEHICLES
    GLASKIN, M
    DESIGN, 1990, (504): : 39 - 39
  • [40] Earth-moving - Subsequent pile underpinning of a sunken turbine foundations
    不详
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1927, 71 : 1444 - 1446