Assessing the role and significance of project selection by the contractors in the Saudi construction industry

被引:0
|
作者
Bageis, Abdulrahman [1 ]
Alsulamy, Saleh [1 ]
机构
[1] Taibah Univ, Engn Sci & Tech Dept, Coll Community, Madina, Saudi Arabia
来源
ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION | 2021年 / 13卷 / 01期
关键词
contractors; construction company; project selection; Saudi Arabia; PORTFOLIO MANAGEMENT; RISK;
D O I
10.2478/otmcj-2021-0005
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Introduction: Construction companies hold great significance in Saudi Arabia due to new developments taking place in the region. A project automatically turns out better if it has been selected based on the level of expertise and resources available to the construction company and vice versa. Purpose: The study aims to investigate the importance of project selection by the contractors within the Saudi construction industry. Methodology: The study has employed a quantitative research design to conduct a survey through the administration of questionnaire. A total of 46 employees from construction companies were selected. A questionnaire was distributed among maintenance contractors, contractors, and construction contractors. Findings: The findings have shown that mostly organizations were unclassified or classified under the fifth category (projects valuing AED10,000,000 or lesser) (34.8%). Most of the respondents (94.4%) agreed that consideration of the project selection is important. Moreover, there is a positive correlation between the level of importance given to the project selection and the organizational size of the respondents. Success factors play an important role in the project selection phase. Practical implications: Careful project selection is the first step toward the success of the construction company, so it needs to be carried out carefully.
引用
收藏
页码:2367 / 2373
页数:7
相关论文
共 50 条
  • [31] A Holistic Framework for Assessing the Quality of Building Construction in Saudi Arabia
    Alfalah, Ghasan
    Alasaibia, Amer
    Alshamrani, Othman
    Al-Sakkaf, Abobakr
    BUILDINGS, 2023, 13 (07)
  • [32] Fall From Height Accidents in the Construction Industry in Saudi Arabia
    Mahmoud, Abubakar Sadiq
    Sanni-Anibire, Muizz
    Alsafwani, Ahmed
    ARCHITECTURE CIVIL ENGINEERING ENVIRONMENT, 2023, 16 (02) : 101 - 110
  • [33] Survey of information technology and the structure of the Saudi Arabian construction industry
    O'Brien, MJ
    Al-Biqami, N
    DURABILITY OF BUILDING MATERIALS AND COMPONENTS 8, VOLS 1-4, PROCEEDINGS, 1999, : 2327 - 2337
  • [34] A Theoretical Framework to Promote LCA in the Construction Industry of Saudi Arabia
    Shaukat, M. Mobeen
    Luqman, Muhammad
    Asif, Muhammad
    Shuja, S. Z.
    Qannan, Mohammed
    SUSTAINABILITY, 2024, 16 (09)
  • [35] Revenue structure of the dual-role as investor-contractors in PPP project
    Liu, Jiaqi
    Liu, Jicai
    Ruan, Lujie
    NANKAI BUSINESS REVIEW INTERNATIONAL, 2020, 11 (02) : 283 - 298
  • [36] Critical factors affecting construction labor productivity: A comparison between perceptions of project managers and contractors
    Van Tam, Nguyen
    Quoc Toan, Nguyen
    Tuan Hai, Dinh
    Le Dinh Quy, Nguyen
    COGENT BUSINESS & MANAGEMENT, 2021, 8 (01):
  • [37] Hybrid fuzzy MADM project-selection model for diversified construction companies
    Ravanshadnia, Mehdi
    Rajaie, Hossein
    Abbasian, Hamid R.
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2010, 37 (08) : 1082 - 1093
  • [38] APPLICATION OF FUZZY CBR AND MODM APPROACHES IN THE PROJECT PORTFOLIO SELECTION IN CONSTRUCTION COMPANIES
    Abbasianjahromi, H. R.
    Rajaie, H.
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2013, 37 (C1) : 143 - 155
  • [39] Measuring Project Management Performance: Case of Construction Industry
    Demirkesen, Sevilay
    Ozorhon, Beliz
    ENGINEERING MANAGEMENT JOURNAL, 2017, 29 (04) : 258 - 277
  • [40] Risk factors for project success in the Chinese construction industry
    Wu, Ziyu
    Nisar, Tahir
    Kapletia, Dharm
    Prabhakar, Guru
    JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2017, 28 (07) : 850 - 866