A scheduling methodology for dealing with uncertainty in construction projects

被引:17
作者
Bruni, Maria Elena [1 ]
Beraldi, Patrizia [1 ]
Guerriero, Francesca [1 ,2 ]
Pinto, Erika [1 ]
机构
[1] Univ Calabria, Dept Elect Informat & Syst, I-87036 Arcavacata Di Rende, Italy
[2] Univ Calabria, LOGICA Lab, I-87036 Arcavacata Di Rende, Italy
关键词
Construction industry; Uncertainty management; Construction projects; Project scheduling; Resource Management; LIMITED RESOURCES; CONSTRAINTS; MANAGEMENT;
D O I
10.1108/02644401111179036
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Purpose - The purpose of this paper is to address the problem of scheduling under uncertainty in construction projects. The existing methods for determining a project schedule are based on assumption of complete knowledge of project parameters; but in reality there is uncertainty in construction projects, deriving from a multitude of context-dependent sources and often provided as outcome of a risk analysis process. Thus, classical deterministic analysis might provide a schedule which is not sufficiently protected against possible disruptions. Design/methodology/approach - A quantitative methodology is developed for planning construction projects under uncertainty aimed at determining a reliable resource feasible project schedule by taking into account the available probabilistic information to produce solutions that are less sensitive to perturbations that occur on line. The methodology relies on a computer-supported system that allows to identify, analyze and quantify the schedule reliability and the impact of possible disruptions on the duration of the project. Findings - It is found that the proposed methodology can exploit more information about the uncertain parameters than the commonly-used deterministic method, and it provides an improved understanding of the schedule reliability in presence of uncertainty. The schedule generated with a classical deterministic method sets a completely unrealistic planned project delivery date of about 1,250 days, with a probability around 50 per cent to be exceeded. This behavior can be very unsatisfactory for construction projects for which high penalties are usually associated to heavy due date violations. Originality/value - This paper presents an approach for robust scheduling of construction project problem under uncertainty. We provide a tool able to support managers in developing a workable and realistic project schedule to be used as a guideline for project control and monitoring.
引用
收藏
页码:1064 / 1078
页数:15
相关论文
共 33 条
[1]  
Alvarez-Valdez R., 1989, Advances in Project Scheduling, P113
[2]  
[Anonymous], 2013, Stochastic Programming
[3]  
Ben-Haim Y., 2006, Academic
[4]  
Bisschop J., 2006, AIMMS 3 7 USERS GUID
[5]  
Camps JA, 1996, OIL GAS J, V94, P32
[6]  
Chapman C.B., 1997, PROJECT RISK MANAGEM
[7]   PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS - A BRANCH AND BOUND APPROACH [J].
CHRISTOFIDES, N ;
ALVAREZVALDES, R ;
TAMARIT, JM .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1987, 29 (03) :262-273
[8]   COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
DAVIS, EW ;
PATTERSON, JH .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (08) :944-955
[9]   Proactive heuristic procedures for robust project scheduling: An experimental analysis [J].
de Vonder, Stijn Van ;
Demeulemeester, Erik ;
Herroelen, Willy .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) :723-733
[10]  
Guildford WS, 1998, INT J PROJ MANAG, V16, P130